-
Published19/11/2024
-
Deadline18/12/2024
-
Today18/03/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Molch Kattwykdüker Text automatically translated in your browsing language Automatically translated
The project envisages the molting of two DN 300 lines designed for DP25 bar, each about 500 m long (a total of 1 km) from the Drewer main dike (Moorburg power plant) to the Kattwykdamm through the Süderelbe. The two lines are to be melted one after the other. On both sides of the Düker (west and east) from the beginning of the land section to the valves (west about 100 m and east about 50 m) there is no or only insufficient documentation. It is planned to convert the lines to hydrogen. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YLY5DZJ
https://www.dtvp.de/Satellite/notice/CXP4YLY5DZJ
76600000 - Pipeline-inspection services
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.