-
Published02/09/2025
-
Deadline06/10/2025
-
Today19/05/2026
Utilities
- indicates text translated automatically in your browsing language
Optimization Bf Wüstenbrand - Planning services Lph3 - optional Lph 4 and 6, PT1
In Wüstenbrand station, the switches W65W01, W65W02, W65W13, W65W17 and W65W18 are to be renewed in the previous design and the switches W65W03, W65W04, W65W12 and W65W16 are to be replaced by a design with a radius of 760 m in order to be able to drive in/out of the tracks 6503 and 6504 with a branching speed of 80 km/h in the future. According to the flank protection calculation, the switch 65W05 is dispensable as a flank protection switch and can therefore be removed by dismantling gap closure. The stump and the end of the track shall be dismantled. Turnout 14, track 21, track lock GS 12 at turnout 14 and end of track shall be dismantled. The gap must be closed in siding 6506. In addition, an exit signal (65P1) must be installed on track 6501 instead of the RS 65L401Y in the direction of Chemnitz. For this purpose, the following planning services must be provided: Lph3 - optionally Lph 4 and 6, PT I. The following tannins are to be planned: Traffic systems, LST, overhead contact line, 50 Hz - switch heating and Tk.
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/2cb53f1b-8b65-4033-8d3b-d46ee47e33e1
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/2cb53f1b-8b65-4033-8d3b-d46ee47e33e1
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.