ENGINEERING (DESIGN, CONSTRUCTION AND AUTHORITY SURVEILLANCE) OF THE PROJECT: "INSTRUMENT AND MODERNISATION OF A COMPOSITIVE INSTALLATION FOR THE NEEDS OF RSUO - SAMOKOV" - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

ENGINEERING (DESIGN, CONSTRUCTION AND AUTHORITY SURVEILLANCE) OF THE PROJECT: "INSTRUMENT AND MODERNISATION OF A COMPOSITIVE INSTALLATION FOR THE NEEDS OF RSUO - SAMOKOV" Text automatically translated in your browsing language Automatically translated

  • Published
    10/07/2025
  • Today
    13/07/2025
  • Deadline
    14/08/2025
  • Opening of tenders
    15/08/2025
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
ОБЩИНА САМОКОВ
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: BG412 София
Business sector (Main CPV)
45213280 Construction works for compost facility
Total estimated contract value (excluding VAT)
5,476,195.66 BGN
Total final contract value (excluding VAT)
Not available
Tender reference number
460598
Description

ENGINEERING (DESIGN, CONSTRUCTION AND AUTHORITY SURVEILLANCE) OF THE PROJECT: "DEVELOPMENT AND MODERNISATION OF A COMPOSITIVE INSTALLATION FOR THE NEEDS OF RSUO - SAMOKOV" The activities included in the subject are: - Preparation of an investment project in the "Working Project" phase for the site in accordance with the Spatial Development Act, Ordinance No 4 /21.05.2001 on the scope and content of investment projects under the applicable parts (geodesia, technological, architectural, constructive, electrical, water supply and sewerage, PB, PSUSO, PBZ, automation, master plan, audit documentation). Projects will be accompanied by bills of quantities in the applicable parts. The project will clarify the specific design solutions to the extent that ensures the full implementation of the envisaged types of construction and installation works and will ensure the compliance of the design solutions with the requirements for construction works under Article 169 of the Spatial Development Act. - Exercise of author's supervision for the site in accordance with the requirements of Art. 162 of the Spatial Development Act in order to ensure successful implementation of the project and signing of acts and protocols by the Designer for the implementation of stages of construction in accordance with the requirements of. Ordinance No 3 of 31 July 2003 on the drawing up of acts and protocols during construction and Ordinance No 2/31.07.2003 on the commissioning of construction works in the Republic of Bulgaria and minimum guarantee periods for completed construction and installation works, facilities and construction sites and coordination of executive documentation. In carrying out the author's supervision, the contractor will ensure the presence of its specialists in the relevant part when signing protocols and acts; discussing and changing constructive solutions; approval of constructive solutions; preparation of revised drawings/projects; modification of design parts during operation. The contractor will make prescriptions and give technical solutions for the exact observance of the project and the need for possible changes, which are entered in the order book of the construction and are mandatory for the other participants in the construction. - Execution of construction and installation works for the site. The existing site will be expanded by providing for the construction of a shredding area, the construction of new technological sections for the placement of the material, the modernization of technological sections on an existing site, the construction of technological roads for the newly built part of the site, the construction of a reservoir for technological water, the construction of a pipe system for wetting the compost, a drainage system for technological water, the supply of a double-breathing membrane for the composting heaps and fans. Given the insufficient capacity of the existing site, a new installation will be additionally built with a capacity of 7 055.25 tonnes/year in free terrain within the framework of the Samokov Regional Waste Management Centre. The installation is of an open type, with a composting method selected in accordance with the PIP in cells with walls, which can be assembled and disassembled if necessary depending on technological needs and forced aeration covered with a semi-permeable membrane. The installation consists of a reception area (incoming warehouse), a shredding and storage area, a mixing area, a process area (composting), storage of the finished compost. Within the framework of the construction works, the necessary stationary equipment for the operation of the installation will be delivered and installed. The construction is a second category, fourth group, in accordance with Article 137(1)(2)(d) of the Spatial Development Act, in conjunction with Article 8 of Regulation No 1 on the nomenclature of types of construction. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://app.eop.bg/today/460598
Tenders may be submitted
Electronic submission: required
https://app.eop.bg/today/460598
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
15/08/2025 13:00
Award method
Оценяването и класирането на офертите се извършва въз основа на икономически най-изгодната оферта, по критерий за възлагане „най-ниска цена“.
Estimated value
5,476,195.66 BGN
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.