Building an energy block of approx. 475 MW of natural gas at Turceni (“CCCG Turceni”) – design, engineering, procurement, execution of works, commissioning and long-term maintenance services Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject matter of the contract is the design, engineering, procurement, execution of works and commissioning of an energy block (natural gas combined cycle gas turbine – power plant combining two different thermodynamic cycles to generate electricity efficiently, by using waste heat from a gas turbine to produce additional energy through a steam turbine) with a capacity of approx. 475MW at Turceni (EPC) and long-term maintenance services for the main equipment (gas turbine, steam turbine, electric generator and a distributed control system, including their ancillary elements) (LTSA) . The duration of the contract is 194 months and consists of 38 months EPC component and 156 months LTSA component. The warranty period (PND) is at least 36 months from the signing of the acceptance report at the end of the works. In accordance with the provisions of Art.172, par. (1) of Law no.99/2016, any interested economic operator has the right to request clarifications or additional information in relation to the award documentation, in compliance with the deadline set by the contracting entity. The Contracting Entity (CE) sets 2 deadlines by which it will respond clearly and completely to all requests for clarifications, as follows: - first term: on the 27th day (calendar) before the deadline for submission of tenders, the EC will respond to requests that have been submitted up to the 41st day (calendar) before the deadline for submission of tenders; - second/last deadline: On the 11th day (calendar) before the deadline for submission of tenders, EC will respond to requests that have been submitted up to the 19th day (calendar) before the deadline for submission of tenders. In accordance with Article 29(3) of Government Decision No 394/2016, the contracting entity will respond only to requests for clarifications from economic operators by the deadline set. The Contracting Entity is not obliged to respond to other requests submitted after the publication of the replies from the second (last) deadline, if the deadline for submission of tenders is extended. If one or more of the dates set are on a non-working day, the working day immediately following that/those date will be taken into account, provided that the minimum deadline of 10 days before the deadline for submission of tenders is respected. If the minimum deadline of 10 days cannot be met then the response will be published on the day before that/those date Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
45251100 - Construction work for power plant
45262600 - Miscellaneous special-trade construction work
71356200 - Technical assistance services
71320000 - Engineering design services
45100000 - Site preparation work
42112000 - Turbine installations CVP code deduced from the text of the procedure AI-generated
42110000 - Turbines and motors CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.