-
Published23/10/2024
-
Deadline18/11/2024
-
Opening of tenders19/11/2024
-
Awarded23/03/2025
-
Today16/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Lot 1: ‘Engineering of the site ‘Emergency rehabilitation works for the repair of streets in Ahtopol, obsht. Tsarevo, obl. Burgas’; Lot 2: ‘Engineering of the site ‘Emergency rehabilitation works for the repair of streets in the village of Sinemorets, obsht. Tsarevo, obl. Burgas’; Lot 3: ‘Engineering of the site ‘Emergency rehabilitation works for the repair of streets in the village of Varvara, obsht. Tsarevo, ... Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Subject of the contract: ‘Engineering (design, implementation of construction works and author’s supervision during construction) of sites in Tsarevo Municipality in four lots: Lot 1: ‘Engineering (design, implementation of construction works and author’s supervision during construction) of the site “Emergency and restoration works on the repair of streets in the town of Ahtopol, municipality of Tsarevo, obl. Burgas’; Lot 2: ‘Engineering (design, implementation of construction works and author’s supervision during construction) of the site “Emergency restoration works on the repair of streets in the village of Sinemorets, obsht. Tsarevo, obl. Burgas’; Lot 3: ‘Engineering (design, implementation of construction works and author’s supervision during construction) of the site “Emergency restoration works on the repair of streets in the village of Varvara, municipality of Tsarevo, obl. Burgas’ Lot 4: ‘Engineering (design, implementation of construction works and author’s supervision during construction) of the site “Emergency restoration works on the repair of streets in the village of Rezovo, obsht. Tsarevo, obl. Burgas’. Scope of the contract Under the Engineering Contract, the Contractor under the Contract for each lot of the contract is to carry out the following activities: Geodetic surveying of the adjacent terrain; Additional studies as necessary; Preparation of an investment project in the technical design phase of the site, in scope and content in accordance with Ordinance No RD02-20-2 of 20.12.2017 on planning and design of the communication and transport system of urbanized territories and Ordinance No 4 of 21.05.2001 on the scope and content of investment projects, laws and regulations of the Republic of Bulgaria and in accordance with the requirements of the Contracting Authority; Performing all necessary activities for coordination of the investment project with the Employer, central and territorial administrations, specialized control bodies and operating companies on behalf of the Employer; Reflecting the recommendations and remarks made in the course of conducting the coordination procedures with the Contracting Authority, central and territorial administrations, specialized control bodies and operating companies, and of carrying out the assessment of the compliance of the investment project with the essential requirements for construction works by the Consultant; Obtaining all necessary opinions and permits necessary to carry out its work in accordance with the Bulgarian legislation; Legal, quality and timely start, execution and completion of construction, including delivery of construction products, mechanization, workforce and any services and activities necessary for the execution of construction in accordance with the technical specifications and investment projects, in accordance with the Spatial Planning Act (SPA) and its implementing regulations, all other applicable normative documents and the Public Procurement Contract; Timely drawing up of the acts and protocols during construction in accordance with the requirements of Article 163(2)(3) of the Spatial Planning Act; Storage and provision, upon request by the other participants in the construction or by a control body, of the construction papers, the order book of the construction under Art. 3 of the Spatial Planning Act, the acts and protocols drawn up during the construction, and other technical documentation on the implementation of the construction; Author's supervision during construction in volume and content according to the Spatial Development Act and the secondary legislation for its implementation; Preparation of executive documentation pursuant to Article 175 of the Spatial Planning Act; Removal of all defects found within the warranty period; Fulfilment of administrative requirements in accordance with the applicable legal framework. Lots: This contract is divided into 4 (four) lots: .... Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/423755
https://app.eop.bg/today/423755
45233252 - Surface work for streets
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.