-
Published26/06/2025
-
Today19/07/2025
-
Deadline22/07/2025
-
Opening of tenders22/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Construction consulting Sustainability coordination Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Construction consultancy in the area of sustainability coordination according to BNB/QNG, performance phases 1-9 for the new construction of a 5-speed secondary school, a 3-way sports hall, a house for children with 2 crèche groups and 2 kindergarten groups, a service apartment for technical property management, an underground car park and outdoor sports areas on Forstenrieder Allee 256, 81476 Munich. At the time of the call for tenders (current planning status), the project consists of the following components: 1. New construction of a 5-course secondary school with THV service apartment and outdoor sports areas 2. New construction of a 3-way sports hall with club sports use and grandstand as well as an underground car park 3. Extension and conversion of a listed villa into a house for children (2-2-0) The following areas can currently be assumed: GFA: Realschule = 13,834.00 m2, sports hall = 5,823.20 m2, HfK = 1,366.10 m2 BRI: Secondary school = 54,652.76 m3, sports hall = 32,300.19 m3, HfK = 4,520.93 m3 NUF (1-7): Realschule = 7.975 m2, Sporthalle = 3.136 m2, HfK = 685 m2 NF (1-6): 9,400 m2 Commissioning is planned for April 2030. The project started in May 2024 with the performance phase 1 according to the HOAI. In the area of the cafeteria and/or auditorium, a meeting place is planned. The monument ‘Forstenrieder Allee 250’, consisting of a single-storey country house (currently used as a residential building) and a gate complex, is located on the property and must be taken into account when planning accordingly. Currently, it is planned to use the monument in the future as a house for children (2-2-0). Due to the prevailing area competition (tree and species protection, monument, adjoining A95 motorway with no-cultivation zone and atypical layout of the property) on the property, the most compact building structure and roof use is required. The new buildings are to be partially or completely built in wood or wood hybrid construction. Wood construction, ecological building materials, circular construction, favorable energy consumption in production and operation, energy production and minimization of the sealing area are relevant topics. Text automatically translated in your browsing language Automatically translated
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.