-
Published13/03/2025
-
Deadline18/03/2025
-
Opening of tenders18/03/2025
-
Awarded17/04/2025
-
Today11/10/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Construction of Meritie and Meritienaukio Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
In the construction project, public areas will include: - Meritie between Kaitaantie - Hyljemäenportti - Meritienaukio (upper and lower level) - Meritie pile plates - Meritie support walls - Syvänsalmensilta - Syvänsalmenkatu and Hyljemäenportti junction and street sections - Lapiarinpolku section west of Syvänsalmensilta - Ridar route section at Syvänsalmensilta and Länsimetro metro centre - Djupsundsbäcken stream in Syvänsalmenmetsä - Syvänsalmenpuisto section - Havaintopolun rumpu - Rejection of HSY's main sewer in private areas - Länsimetro block (31127 C-1) square areas, their structures and bicycle parking - Syvänsalmenkatu 1 and 31155 AK-1) The contract is located in Espoo's Kaitaa (31st) district. In addition to the construction of street structures, the works also include the construction of green, paving and landscape structures, a water supply network, technical networks, skill structures, foundation reinforcements, the transfer of streambeds (Djupsundsbäcken), lighting and traffic control. The northern part of Meritie will be implemented with a narrowed cross-section in phase 1 between Kaitaantie and Syvänsalmensilta. At Eteläpää, Meritie will be connected in phase 1 to the current arrangements for Hyljemäenportti, Hylkeenpyytäjäntie and Havaintopolku. The work also includes the removal of the surplus soil heap located in the Meritie street area and the adjacent block area 31126. The number of bicycle racks in the design area will be implemented according to the 1-phase plans. Renewable, fossil-free fuels are used in the construction machinery and excavation vehicles of the contract. Attention will also be paid to the emission values of natural stone materials used in the contract. Text automatically translated in your browsing language Automatically translated
https://tarjouspalvelu.fi/espoo?id=539502&tpk=1f1c3963-bd71-4640-a75e-ef794f7318e3
https://tarjouspalvelu.fi/espoo?id=539502&tpk=1f1c3963-bd71-4640-a75e-ef794f7318e3
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
45233000 - Construction, foundation and surface works for highways, roads CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Urakkahinta lasketaan urakan yksikköhintaosuus+ kokonaishintaosuus. Urakan vertailuhinta on urakkahinta+ lisä-ja muutostyöhintaluettelo yhteensä. Urakoitsijaksi valitaan halvimman vertailuhinnan antanut urakoitsija. Hankintapäätös tehdään tarjouksen mukaisella urakkahinnalla.
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.