Published18/06/2025
-
Today22/06/2025
-
Deadline21/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Modernization of the line Horažďovice in front. (outside) – Plzeň Koterov (outside) Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject-matter of the public contract ‘Modernisation of the line Horažďovice upstream (outside) – Plzeň Koterov (outside)’ is: a) Preparation of the Building Design (study), which will be prepared for selected buildings according to paragraph 5.2.1 ZTP. The agreed final variant of the Construction Design (study) for the selected buildings will be finalised in further stages of documentation. (b) Preparation of the documentation for obtaining the EIA Verification Mandatory Opinion pursuant to Section 9a of Act No 100/2001 and obtaining this Opinion. (c) Preparation of the Project Documentation for Transport Infrastructure Construction Permit (DPS) under the BIM regime, specifying the subject matter of the Work to the extent that it can be discussed in the project permit procedure, obtaining a final project permit (construction permit) pursuant to Act No 283/2021, the Construction Act, (hereinafter referred to as the ‘Building Act’), including the Opinion of the notified body at the stage of issuing the project permit and the activities of the OSH coordinator at the stage of preparation, including the preparation of the OSH plan on the construction site and the maintenance manual. (d) Preparation and submission of the application for the project permit pursuant to the Building Act, including all the required documents, the result of which will be the project permit (construction permit). The Contractor shall cooperate in issuing the relevant decisions until they become final. e) Processing the Work in BIM mode and creating the BIM Information Model according to Annex 11 to the BIM Protocol, including all its annexes. The information model is a part of the Work and will be processed, discussed and submitted continuously and together with other parts of the Work in accordance with the Performance Schedule pursuant to Annex 5 to the Act. (f) Preparation of the Project Plan Update pursuant to the Rules for the Preparation and Implementation of Transport Infrastructure Actions financed by the State Fund for Transport Infrastructure (hereinafter referred to as the ‘MoT Rules’). The scope of this performance is reserved by the Client as a change of the contractual obligation in accordance with Section 100(1) of the Act. The Contractor shall implement the performance on the basis of the Client's instructions if the expected investment costs are exceeded by 10% or if the technical solution of the construction is substantially changed. g) Performance of the Designer's Supervision during the construction of the PDPS. h) Performance of technical support, promotion and PR. The scope of this performance is reserved by the Client as a change of the contractual obligation in accordance with Section 100(1) of the Act. The Contractor shall implement the performance on the basis of the Client's instructions in a situation where the need for services provided in addition to the VTP/DOCUMENTATION/07/24 arises from the course of the permitting process. i) Processing of energy calculations of the entire Horažďovice arm in advance. – Plzeň Koterov, which will examine the proposed power supply concept and the preparation of a connectivity study for the Nezvěstice TNS building. The scope of this performance is reserved by the Client as a change of the contractual obligation in accordance with Section 100(1) of the Act. The Contractor shall carry out the performance on the basis of the Client's instructions. Detailed specification of the subject of performance of the public contract is regulated in other parts of the tender documentation. Text automatically translated in your browsing language Automatically translated
https://zakazky.spravazeleznic.cz
https://zakazky.spravazeleznic.cz
71322000 - Engineering design services for the construction of civil engineering works
71311230 - Railway engineering services
71313400 - Environmental impact assessment for construction
71317000 - Hazard protection and control consultancy services CVP code deduced from the text of the procedure AI-generated
71246000 - Determining and listing of quantities in construction CVP code deduced from the text of the procedure AI-generated
71248000 - Supervision of project and documentation CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.