Italy-Bolzano: Electric motors, generators and transformers
The purpose of the contract is to supply, set up, checks and tests after laying according to the formula of the ‘turnkey’ at the San Antonio Selnet C.P. in the municipality of Renon (BZ), 1 G.I.S. department for interior, three-phase simple bar, insulated at a voltage of 72.5 kV, with insulation in SF6 gas, complete with switches, line cutting machines, combined barrels and earthing machines, combined current reducing transformers (TAL) and voltage (TVL) and omopolar transformers (TO) to be inserted on the scheduled arrival compartments, under the conditions set out in the technical specifications.
It also includes the provision, installation and testing after deployment of the command and control protection system in accordance with Selnet ATCP2014 specification and as specified below, including the system of continuity and supply of ancillary services.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.