-
Published29/05/2024
-
Deadline07/06/2024
-
Today18/06/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Bühl-Vimbuch sewage treatment plant, 4. Purification stage for the elimination of trace substances, here: Carcass work (including roof, heating, finishing, road and path construction), 2.BA
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
At the wastewater treatment plant of the wastewater association Bühl and the surrounding area in the OT Bühl-Vimbuch, the biological cleaning stage is optimized and a separate adsorption stage is set up. The future expansion size of the wastewater treatment plant is 105,000 p.e. The maximum inflows will be Q T,2h in dry weather, max = 180 L/s and QM = 640 L/s in rainy weather. The adsorption stage will be operated in a partial flow process for 250 L/s. This means that an average of 88% of the annual wastewater volume can be treated. The structural implementation of the measure is planned from 2022 to 2025. The measure will be implemented in two separate construction phases. This call for tenders relates to the structural works (including roof, heating, finishing works, road and path construction), 2.BA.
https:///www.subreport-elvis.de
https:///www.subreport-elvis.de
45252100 - Sewage-treatment plant construction work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.