-
Published31/10/2025
-
Deadline01/12/2025
-
Today11/05/2026
Utilities
- indicates text translated automatically in your browsing language
Destination accommodation BAAINBw - 1. BA / Gneisenau Barracks, Koblenz; General planner
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
For the measure Target accommodation BAAINBw in the Bundeswehr property Gneisenau Koblenz, 1. BA is required for the planning and execution the performance of a general planner. The contract includes the general planning for the construction of the new buildings including connecting corridors as well as the media development for the electrical engineering, for the traffic and outdoor facilities as well as the construction of a PV system, the production of key storage and a locking system of the 1. stage of construction. With regard to a rapid implementation of the construction project, the construction services must be implemented by means of a service description with a service programme and tender planning. The following performance diagrams shall be provided: - Overriding performance obligations General planner: general basic services in performance levels 1-5, supplemented by special services in performance levels 1-5 based on HOAI and the subject-specific performance components: - Property planning buildings, : general basic services in performance levels 1-5, supplemented by special services in performance levels 1-5 based on HOAI as well as specialist planning and consulting services: - Building acoustics: General basic services in performance level 1, performance phases 2 and 3 (in parts), supplemented by special services in performance levels 1, 4 and 5 based on HOAI and AHO No 44 - Room acoustics: General basic services in performance level 1, performance phases 2 and 3 (in parts), supplemented by special services in performance levels 1, 4 and 5 based on HOAI and AHO No 44 - Fachplanung Technische Geräte, Annex II. 1-3 and 7 Supply technology incl. kitchen technology: General basic services in power level 1, power phases 2 and 3 (in parts), supplemented by special services in power levels 1, 4 and 5 based on HOAI - Coordination of Energy Management - AnlGr. 4-6 Electrical engineering incl. PV system, SVS and locking system: incl. PV system, SVS and locking system: General basic services in performance level 1, performance phases 2 and 3, performance level 3, performance phase 6, performance level 4, performance phase 8, supplemented by special services in performance levels 1 and 4 based on HOAI - AnlGr. 8 Building automation/GTL: General basic services in performance level 1, performance phases 2 and 3, performance level 2, performance phase 5, performance level 3, performance phases 6 and 7, performance level 4, performance phase 8, supplemented by special services in performance levels 1-4 or 5 based on HOAI structural design: General basic services in power level 1, power phases 2 and 3, supplemented by special services in power level 1 based on HOAI - Thermal insulation and energy balancing.: General basic services in performance level 1, performance phases 2 and 3, and performance level 5, supplemented by special services in performance levels 1, 2 and 4 based on HOAI and AHO No 23 and other services: - Fire protection: General basic services in power stage 1, power phases 3 and 4, power stage 2, power phase 5, power stage 4, power phase 8 supplemented by special services in power stages 1-4 based on AHO No. 17 - Building Biology and Life Cycle Assessment: General basic services in performance level 1, performance phases 2 - 4, performance level 2, performance phase 5, performance level 4, performance phase 8 supplemented by special services in performance level 4 based on HOAI Die für den 1. The necessary infrastructure such as roads, parking spaces, outdoor facilities, supply and disposal systems (except electrical engineering), etc. are not part of this planning contract. Likewise, the dismantling of the existing infrastructure and the foundation of the new buildings up to the lower edge of the cleanliness layer are not part of this planning mandate. These are planned by third parties.
https://lbb.vergabe.rlp.de/VMPSatellite/notice/CXPLYYDYAFN
https://lbb.vergabe.rlp.de/VMPSatellite/notice/CXPLYYDYAFN
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.