The subject of the contract is the provision of complex design services, engineering services and the performance of construction and technical supervision in the implementation of the project: ‘OLO Technology Park’ (hereinafter referred to as ‘Stavby’ or ‘Project’) in the form of expert support to the investor in the implementation of the Project, aimed at achieving the highest possible quality and efficiency of the Building and its subsequent operation. The future contractor will contribute / direct its activities always in the pursuit of the most effective solution from the point of view of the Construction, among other things, by actively coordinating the design and implementation of the Construction from the position of the performance of the construction-technical supervision of the investor, by being able to search for the risks associated with the construction and effectively prevent them, by assessing and dealing with changes to the Construction in a responsible manner, by providing the investor with adequate and adequate information on the progress of the preparation and implementation of the Construction. For the provision of fulfillment will use persons with adequate education, experience, valid privileges and managerial knowledge. The actual performance/provision of services will take place in 6 stages, the 7th stage represents an option performance, which the company OLO, a.s. may, but does not have to, request: -- Stage 1 - Preparation of documentation to the extent necessary to obtain a decision on the construction plan, representation of the investor in communication with the authorities in the process of obtaining the necessary permits and obtaining a positive decision on the construction plan, preparation of the construction project and ensuring obtaining verification of the construction project, provision of advisory and consulting services to the investor in the preparation of public procurement and preparation of tender documentation; Providing advisory and consulting services to the investor in the preparation of public procurement for the selection of the general contractor Construction and preparation of tender documentation; -- Stage 2 – Participation in the public procurement of the General Contractor of Design & Build; -- Stage 3 – Inspection and approval of construction implementation documentation (RDS) submitted by the general contractor of the construction in the design phases of the implementation project (PPP) and documentation of the organizational / technical / technological / control procedures of the general contractor of the construction for construction purposes (RD); -- Stage 4 – Performance of construction-technical supervision of the builder over the realization of the construction, performance of independent technical inspection and activity of the occupational safety and health coordinator; -- Stage 5 - Inspection and approval of the accompanying technical documentation (STD) / operational documentation (PDS) submitted by the general contractor of the construction and inspection and approval of the implementation documentation of the construction (RDS) submitted by the general contractor of the construction in the design phases of the DSZ; -- Stage 6 - Supervision of post-installation cleaning operations, functional tests, putting the building equipment into permanent operation and optimization of technology, active participation in the acceptance of the work from the general contractor of the building; -- Stage 7 - Advice and technical support during the first three years of operation. Spol. OLO, a.s. elaborated the description of the subject of the contract in the above documents, which are annexed to the tender documents. The scope of the activities in the different stages and the contractual conditions will be the subject of negotiations (their specification/supplementation, etc.). A definitive version of these documents will be annexed to the invitation to tender. Spol. OLO, a.s. strongly requests suppliers to become duly acquainted with these documents already at the time of submission of requests to participate or at the latest at the time of submission of basic tenders: - Description of the subject of the contract - EIA authorisation documents - BIOGAS AND COMPOSTING FACILITY & SORTING PLANT CONCEPT STUDY - EIR to BIM including BEP template; The BEP template will be commented on in the basic offer and subsequently submitted in the final offer of the so-called Bid BEP. X. SP) and to the signing of the contract the so-called Contractual BEP (see Chapter II of the Agreement). XV. SP). - Contract for the provision of services and the performance of activities of the construction manager ‘Design services, engineering and civil engineering supervision for the OLO Technology Park’ (‘the Contract’).
https://josephine.proebiz.com/sk/tender/69769/summary
https://josephine.proebiz.com/sk/tender/69769/summary
71314000 - Energy and related services
71244000 - Calculation of costs, monitoring of costs
71241000 - Feasibility study, advisory service, analysis
71323000 - Engineering-design services for industrial process and production
71320000 - Engineering design services
71322100 - Quantity surveying services for civil engineering works
71541000 - Construction project management services
71248000 - Supervision of project and documentation
71315300 - Building surveying services
51100000 - Installation services of electrical and mechanical equipment
71317200 - Health and safety services
71251000 - Architectural and building-surveying services
71310000 - Consultative engineering and construction services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.