Provision of consultancy services under Article 166(1) of the Spatial Development Act (ZUT) – performance of compliance assessment of investment projects and construction supervision for the site ‘Construction of incoming infrastructure (External connections) for a composting plant for biodegradable waste for the purposes of the Shumen Waste Management System, which serves the municipalities of Shumen and Novi Pazar’ - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Provision of consultancy services under Article 166(1) of the Spatial Development Act (ZUT) – performance of compliance assessment of investment projects and construction supervision for the site ‘Construction of incoming infrastructure (External connections) for a composting plant for biodegradable waste for the purposes of the Shumen Waste Management System, which serves the municipalities of Shumen and Novi Pazar’

  • Canceled
    12/06/2026
  • Today
    17/08/2026
Status
Canceled
Type of contract
Services
Subject for Renewal
No
Buyer
ОБЩИНА ШУМЕН
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: BG333 Шумен
Business sector (Main CPV)
71521000 Construction-site supervision services
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
The procedure is closed
Number of lots
2
Tender reference number
577247
Description

This negotiated procedure without prior publication of a contract notice, concerning: ‘Provision of consultancy services under Article 166(1) of the Spatial Development Act – assessment of the compliance of investment projects and construction supervision for the site ‘Construction of incoming infrastructure (External connections) for a composting plant for biodegradable waste for the purposes of the Shumen Waste Management System, which serves the municipalities of Shumen and Novi Pazar’, comprises two lots: ​​​​​​​ The subject of lot № 1 includes the following activities for the site: - Exercising construction supervision during construction until acceptance and commissioning of the construction works within the mandatory scope regulated by the Spatial Development Act and the secondary legislation on its implementation, including carrying out inspection and control of the construction products delivered and incorporated into the construction works, ensuring the implementation of the basic requirements for the construction works in accordance with the requirements of the ordinance under Article 9, paragraph 2, item 5 of the Technical Requirements for Products Act, as well as coordination of the construction process until the commissioning of the construction works, including control of the quantities, quality and conformity of the construction and installation works performed with the contract for the execution of the engineering works on the site, as well as the other activities covered by the engineering contract; - Performing the functions of a Coordinator for safety and health in accordance with the provisions of Ordinance № 2 of 2004 on the minimum requirements for health and safety at work in the performance of construction and installation works, including the fulfillment of all obligations of the Contracting Authority provided for in the said Ordinance; - Preparation of a Final Construction Report pursuant to Article 168(6) of the Spatial Development Act and Ordinance № 2 of 31 July 2003 on the commissioning of construction works in the Republic of Bulgaria and minimum guarantee periods for completed construction and installation works, facilities and construction sites, and an updated Technical Passport for construction pursuant to Article 176a of the Spatial Development Act and Ordinance № 5 of 2006 on technical passports for construction works; - Management of the commissioning processes until the issuance of a Permission for use; - Liability under Article 168(7) of the Spatial Development Act until the expiry of the warranty periods for the respective types of construction and installation works. The subject of lot № 2 includes an assessment of compliance with the essential requirements for construction works in all parts of the investment project, in volume and content in accordance with the Spatial Planning Act, including an assessment of compliance and technical control of the ‘Constructive’ part in accordance with Article 142(10) of the Spatial Planning Act and the preparation of a comprehensive report on the conformity assessments carried out. The Contractor shall assist the Assignor in the procedure for coordination and approval of the investment project and issuance of a building permit. The detailed description of the requirements for participants is set out in the Technical Specifications.

Submission Method
Not available
Tenders may be submitted
Not available
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.