1. Scope
2. Hourly accounting
3.1. Inspection measurement with MODATA single line
3.2. Inspection measurement using MODATA line Loop
3.3. Control measurement with MODATA single line
3.4. Control measurement using MODATA line Loop
3.5. Inspection measurement of LCP installations
3.6. Intensive measurement/per km (4 value measurement)
3.7. Soil Resistance Measurements
3.8. Inclusion of GPS data
3.9. Electrical inspection of pressed product pipes
3.10. Calibrate a pipe current measuring station
3.11. Initial reception of ground-to-air transitions
3.12. Uptake of ground-to-air transitions
4. Installation and repair:
5. Vehicles
6. AC – Measures
7. Material
The following repairs and measures are to be carried out as part of maintenance:
Final Report:
The final report must contain the following information:
— Summary assessment of the effectiveness of the PPS
— Summary list of deficiencies
— Proposals for remedial action
— Test results and explanatory notes.
Framework agreement with several operators
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.