Poland-Rzeszów: Consultative engineering and construction services

  • Published
    06/09/2016
  • Deadline
    03/11/2016
  • Awarded
    01/03/2017
  • Today
    28/09/2026
Status
Awarded
Type of contract
Works
Subject for Renewal
No
Buyer
Podkarpacki Zarząd Dróg Wojewódzkich
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: Not available
Business sector (Main CPV)
71310000 Consultative engineering and construction services
Total estimated contract value (excluding VAT)
9,579,985.77 PLN
Total final contract value (excluding VAT)
4,348,237.03 PLN
Tender reference number
PZDW/WZP/3052/WFU/13/2016
Description

I.The object of the contract shall be:
‘Reconstruction of provincial road No 881 – ul. Kraszewski and ul. Cetnarski in Łańcat, consisting of the construction of a rainwater sewerage system and the reconstruction of the conflicting technical infrastructure from km 22+ 146 to km 23+ 516.7 km, reconstruction of the road and the construction of a pavement in the section 22+ 146 to 23+ 067.5 km
— Renovation of carriageways and pavements from km 23+ 067,5 to km 23+ 516.7
— Construction of a section of the rainwater system with the outlet to the Mikośka stream and the consolidation of the stream in the area of the bridge along the street. Cetnarski in Łańcut’
as part of the task: ‘Extension of provincial road No 881 Sokołów Małopolski – Łańcut – Kańczuga – Żurawica on the Czarna – Łańcut section, along with the construction of a bridge on the river Wisłok and Mikośka + ul. Kraszewski in Łańcat’.
II. The contract shall include:
II.1.Implementation of construction works concerning:
— Road coaches and related earthworks
— Pavement construction
— Construction/conversion of public and individual exits
— Fortifications of ditches and turbot floors
— Horizontal markings
— Vertical markings
— Underground and ground weapons infrastructure
— Pavement sections.
The task will be carried out on the basis of documentation entitled:
A.“Reconstruction of provincial road No 881 – ul. Kraszewski and ul. Cetnarski in Łańcat, consisting of the construction of a rainwater sewerage system and the reconstruction of the conflicting technical infrastructure from km 22+ 146 to km 23+ 516.7 km, reconstruction of the road and the construction of a pavement in the section 22+ 146 to 23+ 067.5 km
— Renovation of carriageways and pavements from km 23+ 067,5 to km 23+ 516.7
— Construction of a section of the rainwater system with the outlet to the Mikośka stream and the consolidation of the stream in the area of the bridge along the street. Cetnarski in Łańcut’
The reconstruction will be carried out on the basis of the notification of 6 October 2015 (to which the Rzeszów PUW by letter of 2 December 2015 – no objection was raised).
Technical parameters:
Works – 307741-2016 – TED Tenders Electronic Daily Page 2 of 24
— provincial road class Z
— traffic load category KR4
— a road situated on built-up land.
— lane width: 3.5 m
— number of lanes: 2
— width of carriageway: 7.0 m
— length of rebuilt road section: 921.5 mb
— ground frost resistance 0.65 hz = 0,65 x 1,0 = 0.65 m.
B.‘Renovation of carriageways and pavements of provincial road No 881 – ul. Kraszewski and ul. Cetnarski in Łańcat at km 23+ 067,5 to 23+ 516.7 km’
The refurbishment will be carried out on the basis of the notification of 6 October 2015 (to which the Rzeszów PUW by letter of 2 December 2015 – no objection was raised).
Technical parameters:
— provincial road class Z
— traffic load category KR4
— a road situated on built-up land.
— number of lanes: 2
— width of carriageway: 6-7.0 m
— length of rebuilt road section: 449,2 mb
— ground frost resistance 0.65 hz = 0,65 x 1 = 0.65 m.
C.“Construction of rainwater sewerage and reconstruction of the conflicting technical infrastructure from km 22+ 146 to km 23+ 516.7”
The construction of the sewerage system will be carried out on the basis of the Notice of intention to proceed with construction works dated 6 October 2015. (to which the Rzeszów PUW by letter of 2 December 2015 did not raise any objection).
The rainwater drainage system under construction will serve to drain the carriageways, pavements.
From km 22+ 146 to km 22+ 970,23, the sewerage system is designed at the roadside. This necessitates the removal of lighting cables and power poles (redesigned).
On the remaining route, the rainwater system is designed in the centre of one of the carriageways in the streets of Kraszewski and Cetnarski.
In addition, the project includes a solution to a collision with existing infrastructure on the road – translating three sections of the pipelines crossing the road, translating three sections of the water supply network, securing energy and telecommunications cables with protective pipes, and warming the existing water supply network on sections close to the planned sewage grids. The project also provides for the dismantling of the existing rainwater sewerage system, which will take over the planned sewerage by digging and exporting it and filling the excavation of the excavation with sand with densities.
D.,Construction of a section of the rainwater system with the outlet to the Mikośka stream and the consolidation of the stream in the area of the bridge along the street. Cetnarski in Łańcut’.
The construction of the sewerage section and the consolidation of the stream will be carried out on the basis of Decision No 13/16 of 17 March 2016.
A project is planned to be co-financed by the ERDF under the 2014-2020 Podkarpackie Regional Operational Programme (for documentation A,C and D).
Works – 307741-2016 – TED Tenders Electronic Daily Page 3 of 24
The contracting authority shall require that the works covered by the contract be carried out on the basis of and in accordance with:
— Special conditions of the FIDIC to the general conditions of the construction contract for civil engineering and construction works designed by the Contracting Authority (according to the General Conditions, 4th edition – Polish – unchanged 2008 – translation of the 1st edition of the 1999 edition, which also contains guidance for drawing up the Specific Terms and Conditions).
— Documents relating to the Regional Operational Programme for Podkarpackie Province 2014 – 2020;
— The specifications of the essential terms of the contract, including:
(a) Act of the works contract (Chapter V of the ToR),
(C) the cost estimate (Chapter III of the ToR);
(D) Technical documentation (Chapter IV of the ToR)
(e) Detailed technical specifications (Chapter IV of the ToR)
(F) Instructions for economic operators (Chapter I of the ToR)
— Schedule:
— provision of warranties and warranties for the works carried out for the period
minimum 5 years.
II.2. In particular, the Contractor shall be required to:
(a) fulfil the obligations arising from the Act of the Agreement, the ToR and the applicable legal provisions.
(e) execution of the works in accordance with the decisions, the Act of the Contract, the TSIWZ, the applicable law and the conditions laid down in other administrative decisions,
(F) Inventory of land covered by the investment prior to the start of the construction works.
(g) Restoration of immovable property seized for the purposes of carrying out an investment to a proper condition enabling the property to be used for its intended purpose.
(I) the protection of geodesic points and, in the event of destruction, their restoration.
(J) Ensure respect for the legitimate interests of third parties in the area of impact of the site.
(K) Construction site insurance in accordance with the terms of the Contract.
(m) Performance of bypasses, crossings, commuting to premises, agricultural land/cultivated areas, land used adjacent to the investment
for the duration of the works.
(N) identifying the locations of existing media such as sewerage, telephone and electric lines and poles, water supply network, gas pipes and others prior to excavation or other works.
(o) getting all necessary arrangements with local authorities, companies or owners for the removal and re-installation of existing media.
(p) Introduction of information and souvenir plaques in accordance with the Guidelines of the Managing Authority of the Regional Operational Programme for Podkarpackie 2014-2020 for beneficiaries with regard to information and publicity, and to comply with these guidelines. The contracting authority requires the production of 2 tables
information and 2 souvenir boards. The cost of the 1 information/venue plaque must not exceed PLN 1500 gross.
(Q) Execution of an inventory of access roads (which will be used for the transport of materials for construction) and of the construction works (buildings, fences, etc.) located in the area of impact of the implemented section of provincial road No881.
The inventory must be carried out before the start of the construction work.
The inventory of access roads should be agreed with the relevant road manager.
(R) Exercise an inventory of all existing exits.
(s) transport to the WFD in Łańcat after agreement with the Head of the Provincial Roads District in a destructure of demolition, which is the property of the Contracting Authority.
A handover report must be drawn up to the Contracting Authority. Delivery and unloading costs shall be borne by the Contractor.
(T) Assurances in the event of the need for archaeological surveillance in the course of the earthworks.
(U) check prior to the commencement of studies and works on the site for the presence of any unexplosive/exploded ordnance and, if necessary, saper surveillance.
The Contractor will be liable for all damage to road surfaces, drainage ditches, stands, pipelines, electrical cables, networks or media of all kinds caused by him or its subcontractors in carrying out the works. The Contractor must, without delay, at his own expense, make good any damage and, if necessary, carry out further repair works ordered by the Engineer.
The area necessary for the implementation of the project (which will be sent to the Contractor with a handover report for the construction site) for the duration of the project will be maintained by the Contractor.
From the transfer of the construction site to the issue of the takeover certificate. The contractor will carry out summer and winter maintenance of the section of road No 881. Winter maintenance of roads shall be carried out in accordance with Standard IV adopted in the 2016/2017 season and the instructions entitled ‘Rules on snow and slipping on provincial roads’.
The summer maintenance of the road will consist of mowing grasses. Grass mowing must be carried out 3 times a year,
within the time limits specified by the Contracting Authority.
II.3 Organisation of traffic.
The contractor will draw up and obtain all the necessary opinions and approval of the provisional traffic organisation project. The contractor must inform the traffic authority, the Road Administration and the Provincial Police Headquarters of the date on which traffic is to be organised for the duration of the works (approved by the traffic authority) within a seven-day period.
anticipatory. The above-mentioned advance notice concerns any change in traffic patterns for the duration of the works and the introduction of a permanent traffic organisation.
In addition to drawing up the required traffic organisation designs at its own expense, the contractor must:
— the removal of the time marking of works after completion,
— removal from the crown of road machinery and equipment during work breaks or security in a manner acceptable to the Supervision (Inspector),
— informing residents and persons carrying out business, service activities, the Police, the State Fire Service, the Rescue Service, road transport operators including passenger transport, crisis headquarters, the Marshal’s Office of the Freight Province, producer, supplier) of materials or standards, approvals,
specifications and systems referred to in Article 30(1). 1-3 of the Public Procurement Act, the Contracting Authority allows materials or equivalent solutions to be offered on condition that they guarantee the performance of the subject-matter of the contract in accordance with the ToR and ensure that technical parameters are not lower than those set out in the above-mentioned documents.

Submission Method
Not available
Tenders may be submitted
Submission for all lots
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
The notice involves a public contract
Conditions for opening tenders (date)
Check linked documents for details
Award method
The most economic tender
Estimated value
9,579,985.77 PLN
Final contracted value
4,348,237.03 PLN
Award of contract
Official name: STRABAG Sp. z o.o
Postal address: ul. Parzniewska 10
Town: Pruszków
Postal code: 05-800
Country: POL
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.