-
Published23/05/2025
-
Today18/06/2025
-
Deadline23/06/2025
Utilities
- indicates text translated automatically in your browsing language
AZV - New construction of the wastewater treatment plant Untere Ahr in Remagen, fire protection planning of the buildings in the performance phases 1-9 in accordance with the AHO series of documents No. 17, as of 2022 Text automatically translated in your browsing language Automatically translated
The Untere Ahr Wastewater Treatment Association (AZV) is planning the construction of the Untere Ahr wastewater treatment plant in Remagen after the existing wastewater treatment plant in Sinzig was severely damaged in the flood disaster in 2021. The area selected for the new building is located north of the B 266 on a site that is geodesically about 7-8 m above the old site and is therefore flood-proof. The project is currently in pre-planning (performance phase 2-HOAI). The subject of this call for tenders is the fire protection planning and monitoring services in accordance with the description of services and activities of Drees&Sommer SE. The requirements planning of the AZV for the new construction of the wastewater treatment plant as well as the performance and activity description for this fire protection planning service are part of the procurement documents. According to the demand planning, a wastewater treatment plant with an expansion size of at least 174,000 E is to be built. The aim is to optimise plant operation from an energy and economic point of view with maximum plant availability. Planning with BIM is planned. Possibilities of AI should also be taken into account. The use of AI should include an optimization of processes with regard to resource saving and energy efficiency. The aim is to operate a wastewater treatment plant that is as climate-neutral as possible. The following services have already been awarded: - planning services of the building and open-air plant planning in the performance phases 1-9 according to § 34 HOAI and § 39 HOAI, - planning services of the technical equipment HLS and electrical in the performance phases 1-9 according to § 55 HOAI, - services of the structural design in the performance phases 1-6 according to § 51 HOAI, - project management services in the project stages 1-5 according to issue 9 AHO, - further specialist engineering services. A step-by-step commissioning is planned. First, the performance phases 1-4 and then the performance phases 5-9 are to be commissioned. Time of performance: An approved planning of phase 4 is to be prepared by the end of 2025. Pre-construction measures are foreseen from January 2026. A structural realisation of the measure is planned from October 2026. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YK75KK5
https://www.dtvp.de/Satellite/notice/CXP4YK75KK5
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.