Construction of two multi-family residential buildings with land development and technical infrastructure at ul. Chopin in Tomaszów Mazowiecki. Text automatically translated in your browsing language Automatically translated
2. The subject of the contract are works consisting in particular of: 1) preparing the area for the construction of two multi-family residential buildings; 2) construction of two mixed multi-family buildings with technical infrastructure, where a) building No. 1 (B1) basement building, five-storey with a flat roof, with the so-called high ground floor; Staircase equipped with a crane adapted to the transport of disabled people; on the basement floor, a garage hall, technical rooms and a bicycle room were designed; construction of the skeleton building: reinforced concrete frames and substrings, reinforced concrete ceilings of filigran type, direct foundation on the foundation slab; the use of traditional facade materials has been designed; insulation of the facade of the building with polystyrene - a light wet method. A type of fine-grained plaster with a sand structure was used, in subdued colors; the part of the walls covered with flexible clinker tiles; Balcony railings in the aluminum system are provided, mounted to the front of the balcony board, filled with safe, tempered glass; Building volume (gross): OK. 21 800 m3; ; Usable area of the garage hall approx. 830 m2; b) building No. 1 (B1) basement building, five-storey with a flat roof, with the so-called high ground floor; Staircase equipped with a crane adapted to the transport of disabled people; on the basement floor, a garage hall, technical rooms and a bicycle room were designed; construction of the skeleton building: reinforced concrete frames and substrings, reinforced concrete ceilings of filigran type, direct foundation on the foundation slab; the use of traditional facade materials has been designed; insulation of the facade of the building with polystyrene - a light wet method. A type of fine-grained plaster with a sand structure was used, in subdued colors; the part of the walls covered with flexible clinker tiles; Balcony railings in the aluminum system are provided, mounted to the front of the balcony board, filled with safe, tempered glass; Building volume (gross): OK. 21 800 m3; ; Usable area of the garage hall approx. 830 m2; 4) separation of a total of 150 one-, two- and three-room apartments (75 apartments in each building); 5) execution of all necessary utilities connections, ensuring the proper functioning of the facilities and obtaining a decision on the permit for use. This applies in particular to connections: water supply, sewage, electricity, gas and telecommunications – to the extent necessary to achieve the objective of the investment, regardless of the degree of their inclusion in the design documentation or the volume of works. 6) execution of internal water supply systems, sanitary sewerage and rainwater sewerage; 7) execution of natural gas installations, 8) assembly of electrical and teletechnical installations ensuring use in accordance with the intended purpose, 9) construction of internal roads and parking spaces as well as pavements and other elements of land development. 10) felling of trees; 11) making plantings of greenery; 12) finishing and equipping apartments and common areas. 3. The value of the annual demand index for non-renewable primary energy EP in the buildings resulting from the project may not exceed the value of 52 kWh(m2.year) to which the Beneficiary of the measures committed to achieve and which obliged the Investor to ensure that the project does not cause significant harm to the environmental objectives set out in Article 9 of Regulation 2020/852, in accordance with Article 17 of that Regulation (the values to be achieved are set out in Annex 1 to the FTZ – Designed energy performance of the building). 4. The contractor is obliged to carry out the works in a manner consistent with the DNSH (‘Do No Significant Harm’) principle, i.e. not to violate the environmental objectives of the European Union set out in Article 17 of Regulation (EU) 2020/852, in particular by: − reducing greenhouse gas emissions, − rational management of water resources, − preventing environmental pollution, − promoting the circular economy, − protecting biodiversity. 5. The Contractor will carry out the project with particular regard to the Statement of Environmental Requirements for the General Contractor (Annex 2 to the contract), in particular with regard to: - reduction of noise, dust and pollutant emissions, - management of construction waste. 6. The contractor will appoint a waste management manager at the construction site, who will be obliged to monitor and document the obligations of environmental requirements, including the submission of the necessary reports (in accordance with Annex 2 to the contract). 7. A detailed description of the subject-matter of the contract and the method of its implementation is provided in Annex No 1 to the FTZ and Annex No 11 to the FTZ - model contract and Annex No 2 to the contract (environmental requirements for the contractor). 8. The contractor who refers in the tender to solutions equivalent to those described in the procurement documents is obliged to prove (in the tender), in particular by the means of evidence referred to in Articles 104-107 of the PPL, that the proposed solutions meet the requirements specified in the description of the subject-matter of the contract to an equivalent extent (Art. 5 of PZP). In such a case, the Contracting Authority will call upon the Contractor who has not submitted the evidence in question (and the tender may indicate that it is an equivalent tender) or the evidence submitted will be incomplete to be submitted or completed within the prescribed period, unless, despite the submission of the evidence in question, the tender will be rejected or there will be grounds for invalidating the procedure. The contracting authority may request explanations from economic operators concerning the content of the evidence in question. Text automatically translated in your browsing language Automatically translated
https://platformazakupowa.pl/transakcja/1188237
https://platformazakupowa.pl/transakcja/1188237
45233221 - Road-surface painting work
45233320 - Foundation work for roads
45233200 - Various surface works
45262500 - Masonry and bricklaying work
45313100 - Lift installation work
45112710 - Landscaping work for green areas
45111200 - Site preparation and clearance work
45260000 - Roof works and other special trade construction works
45331000 - Heating, ventilation and air-conditioning installation work
45262370 - Concrete-coating work
45233290 - Installation of road signs
45100000 - Site preparation work
45314000 - Installation of telecommunications equipment
45421100 - Installation of doors and windows and related components
45333000 - Gas-fitting installation work
45262311 - Concrete carcassing work
45262310 - Reinforced-concrete work
45330000 - Plumbing and sanitary works
45311200 - Electrical fitting work
45321000 - Thermal insulation work
45231300 - Construction work for water and sewage pipelines
45233000 - Construction, foundation and surface works for highways, roads
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.