Published30/04/2019
-
Deadline17/05/2019
-
Opening of tenders20/05/2019
-
Today06/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
France-Gap: Hydro-electric plant construction work
As part of the implementation of an H07 contract for the sale of energy, the renovation of a micro hydro power plant with a capacity of 1645 kw, consisting of 2 separate and identical units is envisaged. The work concerns the replacement of the listed equipment after removal and recycling of old equipment. The contract includes preliminary studies, supply, breaks, connections, commissioning of the following equipment: power cells, 2 transformers, 2 alternators of power of the order of 800 to 900 kw the unit, power cabinets, underground air connection cables, connection cables between alternator and transformer, a low current cabinet, 2 controllers, remote monitoring and stand-by management equipment, renewal of lighting and heating installations. Ancillary work: renewal of steel doors, painting inside the building, installation of floor tiles, earthenware against walls
https://www.e-marchespublics.com
45251120 - Hydro-electric plant construction work
31100000 - Electric motors, generators and transformers
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.