Construction of a district heating network along Sienkiewicza and Marcinkowskiego streets in Bydgoszcz Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject of the contract is the execution of construction works for the investment task entitled: Construction of a district heating network along Sienkiewicza and Marcinkowskiego streets in Bydgoszcz. The subject-matter of the contract shall include: a) construction of a district heating network from point. C1 to para. C2 including telecommunication plumbing and alarm system, in accordance with the construction design, executive designs and the decisions, opinions, notification of works/construction permit contained therein, all preparatory, earthwork, assembly, reconstruction and accompanying works. The scope of construction includes a district heating network with a diameter of 2xDN300/450, two branches 2xDN200/315 located in the area of the junction of ul. Sienkiewicza from ul. Chrobrego and branch 2x250/400 at the intersection of ul. Sienkiewicza from ul. Storkowo with the construction/reconstruction of chambers and wells. In addition, 4xØ40/3.7 teletechnical sewerage from HDPE pipes was designed along the entire projected network, along with SK1 and SK2 teletechnical wells. b) reconstruction of the water supply network with connections along ul. Sienkiewicza in Bydgoszcz on the section from the intersection with ul. Lipowa to the junction with ul. Śniadeckie Street and in the area of the intersection of ul. Sienkiewicza from ul. Podolska. c) reconstruction of the existing power infrastructure owned by ENEA Operator, including low-voltage cable lines. On the Contractor's side are all arrangements and formalities with the owners of cables subject to reconstruction. The Contractor shall declare that he is able to remove the cable collisions on the basis of the attached documents (the draft collision elimination, technical conditions issued by the gestors, the contract for the elimination of the collision). The Contractor shall appoint an Electrical Works Manager with construction rights of this year and current membership in IIB. d) reconstruction of the existing gas network g100, g150, g200 with existing connections from the intersection with ul. The station to the intersection with ul. Bocianowo in Bydgoszcz, (e) all works related to the need to remove the tree on the basis of Decision ŚG-III.7120.4.91.2024 of 28 August 2024 and works related to the implementation of replacement plantings, which should be carried out in accordance with the guidelines of the WGK, letter No WGK-III.7012.28.2024.NN of 7.06.2024r and annexes. Particular attention should be paid to the obligation of 3-year care of the plantings made. f), occupation of the road lane ul. Sienkiewicza, ul. Marcinkowskiego, ul. B. Chrobry and reconstruction of their construction should be carried out (according to the decision on the location of the district heating network No UP 508/2022 and UP 6/2023, on the locations of armaments – Decision No UP/141/2023 and UP/23/2023 and the conditions set out in letter UD-5015/069/MS/22 of 19/12/2022 and RT.405/0449/2024 of 16.07.2024) in accordance with the pavement reconstruction project. ATTENTION! Before the start of implementation and during the work carried out, it is necessary to plan the staging and coordination of all work in consultation with the ZDMiKP and the MWiK. Costs incurred for the restoration of the pavement will be settled on the basis of the as-built cost estimate prepared by the Contractor (measurement) taking into account the unit prices specified in the offer cost estimate attached to the offer form at the stage of submitting tenders. The remaining works will be settled on a flat-rate basis. The costs related to the introduction and maintenance of the traffic organisation project (including the temporary traffic organisation project) should take into account the possible need to change the staged POR, which will arise during the work carried out. (g) Work should be carried out in accordance with the design documentation and all necessary works and arrangements related to the implementation, including paid and free land occupation, payment of security deposits, etc. (h) The area not covered by the pavement restoration project should be restored to its existing state. (i) Throughout the area covered by the investment, a ‘B’ zone of conservation protection is designated, equivalent to the scope of the ‘W’ zone of archaeological protection. This means that all planned land and construction works should be carried out in accordance with the guidelines specified by the Provincial Conservator of Monuments (resolution WUOZ.ZAR.5152.1.19.2024.TZ. of 19.02.2024) and the Municipal Conservator of Monuments (resolution BKZ.4120.15.5.15.2024.IJ. of 17.06.2024). A detailed description of the subject of the contract can be found in the SWZ. Text automatically translated in your browsing language Automatically translated
https://platformazakupowa.pl/pn/kpec_bydgoszcz
https://platformazakupowa.pl/pn/kpec_bydgoszcz
45232140 - District-heating mains construction work
45112710 - Landscaping work for green areas
45200000 - Works for complete or part construction and civil engineering work
45231000 - Construction work for pipelines, communication and power lines
45231110 - Pipelaying construction work
45100000 - Site preparation work
45233000 - Construction, foundation and surface works for highways, roads
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Zamawiający dokona oceny ofert spośród ofert nie odrzuconych, na podstawie następujących kryteriów oceny ofert: Cena 100%. Cena =a (wynagrodzenie ryczałtowe za wykonanie przedmiotu zamówieni) + b (koszty poniesione na odtworzenie nawierzchni) Za najkorzystniejszą zostanie uznana oferta z największą liczbą punktów. Uzyskana liczba punktów zostanie zaokrąglona do dwóch miejsc po przecinku, zgodnie z zasadami matematycznymi. Jeżeli w postępowaniu nie będzie można dokonać wyboru najkorzystniejszej oferty ze względu na to, że zostały złożone oferty o takiej samej cenie, Zamawiający wezwie Wykonawców, którzy złożyli te oferty, do złożenia ofert dodatkowych zawierających nową cenę. Wykonawcy, składając oferty dodatkowe, nie mogą oferować wyższych niż zaoferowane w uprzednio złożonych przez nich ofertach
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.