-
Published04/07/2025
-
Deadline15/07/2025
-
Opening of tenders15/07/2025
-
Today19/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Manual sorting of municipal waste and carrying out preparatory works for sorting waste and works involving the manual dismantling of bulky waste at the ZZO in Legnica Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
1.The subject of the contract is the provision of services of manual sorting of municipal waste along with the performance of preparatory works for sorting waste (cleaning and economic works) and works consisting in the manual dismantling of large-size waste at the Waste Management Plant (ZZO) in Legnica at ul. It's Rzeszotarska. 2.The scope of work includes: 1) manual sorting of municipal waste mixed and raw materials into fractions (plastics, film, waste paper, glass and other materials indicated by the Ordering Party) at the mechanical sorting line and in other places indicated by the Ordering Party at the ZZO, 2) manual sorting of other waste (e.g. construction waste, textiles) into individual fractions (plastics, film, waste paper, glass, clothing, footwear, blankets, etc.) at places indicated by the Ordering Party at the ZZO, 3) work related to preparing waste for sorting and loading and unloading, i.e. separating terraced waste, tearing bags, etc., 4) manual dismantling of bulky waste using simple tools provided by the Contractor (hammers, axes, crows, hand saws, etc.), 5) keeping order at the work station and in the adjacent surroundings, 6) cleaning work on the ZO and adjacent areas. 3.The service will be provided: 1)w dwóch sortowniach odpadów (sortownia odpadów surowcowych oraz sortownia odpadów zmieszanych) przez łącznie 54 pracowników od poniedziałku do piątku w godzinach od 06:00 do 14:00 i od 14:00 do 22:00 (praca w systemie zmianowym) oraz przez 28 pracowników w soboty w godzinach od 07:00 do 15:00, 2)w dwóch sortowniach odpadów (sortownia odpadów surowcowych oraz sortownia odpadów zmieszanych) oraz na terenie ZZO przez 4 pracowników wykonujących prace porządkowe i gospodarcze od poniedziałku do piątku w godzinach od 06:00 do 14:00 i od 14:00 do 22:00 (praca w systemie zmianowym), 3)na terenie ZZO przez 2 pracowników wykonujących prace polegające na demontażu odpadów wielkogabarytowych przez 5 dni w tygodniu od godziny 08:00 do 16:00 (zmiana ośmiogodzinna od poniedziałku do piątku). The Ordering Party reserves the right to introduce modifications to the working time, including the number of hours per shift, which shall be notified to the Contractor at least 24 hours before the planned modification. Modification of working time may also apply to the activation of the third shift, about which the Ordering Party will inform the Contractor at least 7 days in advance. 4.The Ordering Party provides that the work will be carried out from Monday to Friday by 60 people during the day, and on Saturdays by 28 people. The Ordering Party reserves the right to modify the number of employees (reduction or increase), which shall be notified to the Contractor at least 24 hours before the planned modification. In particular, in the event of a major failure of a sorting line, the manual sorting of municipal waste into fractions may be stopped until the failure is rectified. 5.The estimated number of man-hours in the provision of the services covered by the contract is 123.660 man-hours, with the proviso that the Employer, when calculating the estimated number of man-hours, did not take into account breaks in work, which will not be included in the Contractor's remuneration (for example, in the case of an employee on an 8-hour work shift who will have a 30-minute break during the day, the Contractor will receive remuneration for 7.5 man-hours per day of work of that employee). The Ordering Party reserves that the estimated number of man-hours given above may change depending on the needs of the Ordering Party. The Ordering Party guarantees the minimum number of man-hours that will be worked during the implementation of this contract, i.e. 50,000 man-hours. 6.The Contractor is obliged to provide a social and living room in the place indicated by the Ordering Party in the ZZO in accordance with health and safety requirements for employees seconded to perform the service. The social and living room should be equipped with a sink, sinks, shower cabins and toilets. Part of the land on which the social and living room will be located will be leased by the Contracting Authority to the Contractor on the terms described in § 11 sec. 2 of contract No TP/TZZ/5/2025. 7.Before submitting the tender, the Contractor has the opportunity to make a local inspection of the area on which the subject of the contract will be carried out. Detailed provisions on on-site verification are included in point V.4 of the FTZ. 8.The Contracting Authority provides for the possibility of awarding the Contractor contracts consisting in the repetition of similar services, consistent with the subject of the basic contract, as referred to in Art. 1 point 7) of the PPL Act, constituting no more than 50% of the value of the basic contract. The contracts referred to above may be awarded directly within 3 years of the award of the basic contract if there is a need to extend the basic contract in terms of the number of hours of work of persons sorting waste to individual fractions and performing work related to the preparation of waste for sorting (cleaning and economic work) and work consisting in the manual dismantling of bulky waste. In such a case, the Contracting Authority shall provide the Contractor with an invitation to negotiate containing, in particular, a description of the subject of the contract, a model contract and the conditions for participation in the procedure and the grounds for exclusion from the procedure. The contractual provisions contained in the model contract (including the Contractor's remuneration) will be negotiable. 9. The description of the subject of the contract is included in Annex 1 to the model contract, which constitutes Annex 1 to the FTZ. Text automatically translated in your browsing language Automatically translated
https://platformazakupowa.pl/transakcja/1115537
https://platformazakupowa.pl/transakcja/1115537
90500000 - Refuse and waste related services
90510000 - Refuse disposal and treatment CVP code deduced from the text of the procedure AI-generated
Type: price
Description: 1.Legnickie Przedsiębiorstwo Gospodarki Komunalnej Sp. z o. o. jest Zamawiającym, o którym mowa w art. 4 pkt 3 ustawy Pzp. Zgodnie z art. 246 ust. 1 ustawy Pzp Zamawiający, o którym mowa w art. 4 pkt 3 ustawy Pzp może stosować kryterium ceny jako jedyne kryterium oceny ofert albo jako kryterium o wadze przekraczającej 60%. Przy wyborze oferty Zamawiający będzie się kierował kryterium ceny, jako jedynym kryterium oceny ofert. 2. Nazwa kryterium – „Cena”-100%: Ocenie podlega cena brutto (w złotych) za wykonanie zamówienia. Zgodnie z art. 225 ust. 1 ustawy Pzp w przypadku złożenia oferty, której wybór prowadziłby do powstania obowiązku podatkowego u Zamawiającego zgodnie z przepisami ustawy z dnia 11.03.2004r. o podatku od towarów i usług (Dz. U. z 2020r., poz. 106 z późn. zm.), Zamawiający w celu oceny takiej oferty w kryterium ceny, doliczy do przedstawionej w tej ofercie ceny kwotę podatku od towarów i usług, którą miałby obowiązek rozliczyć zgodnie z tymi przepisami. Wykonawca składając ofertę winien poinformować Zamawiającego w pkt 4.4) Formularza ofertowego (Załącznik nr 2 do SWZ) czy wybór jego oferty będzie prowadził do powstania u Zamawiającego obowiązku podatkowego. Jeżeli wybór oferty Wykonawcy prowadził będzie do powstania obowiązku podatkowego u Zamawiającego, to Wykonawca zgodnie z art. 225 ust. 2 ustawy Pzp winien dodatkowo wskazać: -nazwę (rodzaj) towaru lub usługi, których dostawa lub świadczenie będą prowadziły do powstania obowiązku podatkowego, -wartość (bez kwoty podatku) towaru lub usługi objętego obowiązkiem podatkowym Zamawiającego, -stawkę podatku od towarów i usług, która zgodnie z wiedzą Wykonawcy będzie miała zastosowanie. 3. Jeżeli w niniejszym postępowaniu o udzielenie zamówienia, w którym jedynym kryterium oceny ofert jest cena, nie będzie można dokonać wyboru najkorzystniejszej oferty ze względu na to, że zostaną złożone oferty o takiej samej cenie, to Zamawiający na podstawie art. 249 ustawy Pzp wezwie Wykonawców, którzy złożą takie oferty, do złożenia w terminie określonym przez Zamawiającego ofert dodatkowych zawierających nową cenę. Wykonawcy, składając oferty dodatkowe, nie mogą zaoferować cen wyższych niż zaoferowane w uprzednio złożonych przez nich ofertach (art. 251 ustawy Pzp).
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.