Building physics (heat protection and energy balancing, but without building acoustics (sound protection) and room acoustics) as well as other services Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The Medical Center for Health Bad Lippspringe GmbH (MZG) is planning the energetic refurbishment of the Martinusquelle Clinic with thermal swimming pool and sports hall. The Martinusquelle clinic will be fully operational during the entire reconstruction phase and all patients will continue to be on site. The refurbishment is carried out in stages. The parts of the building affected by the refurbishment are pulled empty as part of the project implementation and can then be refurbished in one go. The construction work is provisionally estimated at EUR 8.62 million net. The eligible costs (net) for the services requested here are shown separately in the terms of reference (Part B). Against this background, in the context of an open procedure, the award of the technical planning with the performance profile building physics in accordance with Annex 1, point 1.2 (on § 3(1) HOAI 2021) (heat protection and energy balancing, but without building acoustics (sound protection) and room acoustics), performance phases 1-7, with the inclusion of DIN 18599. In particular, the other services are required (these form an integral part of the initial contract and are listed in the tender specifications (Part B): - Building simulation, balancing of subsidies, energy parameters, creation of an energy concept - thermal bridge analysis, detailed development, quality assurance - energetic construction support, blower-door tests, thermography - creation of energy certificate, funding certificates, final report - JIT evidence, CO2 savings/reduction of primary energy demand in accordance with the requirements of the ERDF grant decision, which is part of the procurement documents - thermal bridge evaluation and implementation details At least the services of service phases 1 to 4 (output assignment) will be awarded. The commissioning of further service phases takes place in the case of their commissioning in whole or in part in the following stages: - Level 1: Performance phases 1 - 4 (initial assignment), - Level 2: Performance phases 5 - 6 - Stage 3: Performance phase 7 The contractor is not entitled to commission further services and the stages (in whole or in part). No additional fee claims can be asserted from the gradual commissioning. All planning, documentation and documentation services must be provided in accordance with the ERDF, insofar as they relate to services supported by the grant decision. For further details, reference is made to the procurement documents, in particular to the specifications. It is expected that all specialist planners will work together to achieve the funding criteria. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YXS5S30
https://www.dtvp.de/Satellite/notice/CXP4YXS5S30
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.