New wastewater treatment plant Weinsheim, Lot 3 - EMSR-Technik

  • Published
    18/06/2026
  • Deadline
    17/07/2026
  • Today
    14/08/2026
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
Verbandsgemeinde Prüm
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEB23 Eifelkreis Bitburg-Prüm
Business sector (Main CPV)
45311000 Electrical wiring and fitting work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
64/26
Description

The Verbandsgemeindewerk Prüm is planning the new construction of the wastewater treatment plant Weinsheim outside the village Weinsheim on the K 179 in the direction of the road B410 to Prüm and Gerolstein. A biological wastewater treatment plant for 3,000 p.e. is planned. For this purpose, the BIOCOS(R) method was determined in advance as a preferred variant for wastewater treatment as part of an extensive comparison of variants. This process consists of a two-street structure with one aeration tank each and two sedimentation and circulation tanks (SU tanks). Here, the wastewater first enters the aerated aeration tank, which is connected to the SU tanks via inclined openings. During operation, the water and sludge volumes are exchanged between the aeration tank and a SU tank using inclined openings and ventilated lifting shafts. The second SU tank is not involved in the exchange during this time, but a settling of the sludge masses takes place and a clear water zone is formed. The clear water is discharged via a trigger from the SU basin and can be introduced into the pre-washer as purified wastewater. The project is supported, among other things, with funding for a fast construction period. This requires parallel work on the trades and mandatory compliance with the overall construction time. The deadlines stipulated in the contract must be observed. The overall wastewater treatment measure will be divided into three main lots: Lot 1 - Construction technology, Lot 2 - Plant technology, Lot 3 - EMSR technology. The side offers are permitted, expressly only for combined discounts for offers on several lots.

Submission Method
Electronic via:
https://www.dtvp.de/Satellite/notice/CXP4YK7MJJ0
Tenders may be submitted
Electronic submission: required
https://www.dtvp.de/Satellite/notice/CXP4YK7MJJ0
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
Preis
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.