-
Published11/06/2025
-
Today18/06/2025
-
Deadline08/07/2025
-
Opening of tenders08/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
3030 Timber construction work Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
New construction of a secondary school with canteen, double sports hall, break hall as a meeting place and free sports facilities on the opposite side of the Hohenbrunner Straße building is planned in parts as a wood hybrid construction. Execution is carried out in 1 construction phase. Address Baufeld: Hohenbrunner Straße 110 85662 Hohenbrunn BRI approx. 64,500 m3 GFA approx. 1 basement cross plywood walls, C24, thickness 18cm to 32cm: 1.035m2 columns, BSH: ca. 754m, undercarriages, BSH: 930m, HBV ceilings, with 12cm concrete C30/37, partially with acoustic requirements and partially visible: 5.166m2 HBV ceilings with 12cm reinforced concrete C30/37 BSH truss over sports hall, heights per truss approx. 1.52m to 2.175m, length approx. 10Piece Drywall Fire Protection Panels Walls and Covers: approx. 1.330m2 fire protection claddings Ceiling underside: 14m2 Integrated steel beams, steel sheets and steel components: approx. 12.300kg As well as: Construction site equipment, mobile crane for hall trusses, workshop planning, construction-time protection of wooden components, emergency sealing on roofs, construction-time weather protection roof over atrium (WxL approx. 15.5m x 19.0m), measures for sustainability certification, DGNB+QNG. Text automatically translated in your browsing language Automatically translated
https://plattform.aumass.de/Veroeffentlichung/av25682c-eu
https://plattform.aumass.de/Veroeffentlichung/av25682c-eu
45422000 - Carpentry installation work
45214000 - Construction work for buildings relating to education and research CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Die Gewichtung der Angebote erfolgt zu 100% nach Preis. Der Preis ist das alleinige Zuschlagskriterium.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.