-
Published24/10/2025
-
Today15/11/2025
-
Deadline21/11/2025
-
Opening of tenders24/11/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
«IMPLEMENTATION OF ENGINEERING FOR THE RECONSTRUCTION OF THE WATER NETWORK S. ELENOVO, NOVA ZAGORA MUNICIPALITY – PART 4» Text automatically translated in your browsing language Automatically translated
It is planned to carry out reconstruction of the existing street water pipes with the building plumbing branches along streets from 52 to 36 to 173, 51 to 1, 53 to 54, 47 to 45, 54 to 44, 41 to 2, 1 to 2, 46 to 43, 40 to 6, in accordance with the regulation plan of the village of Elenovo. Scope of reconstruction in the settlement: The total approximate length of the street water supply network is about 3610.00 m, with approximate lengths in diameters being:, ф110 PPP – 2270.00m, ф90 PPP – 1340.00m. The building plumbing deviations will be mainly F32 PEF with an approximate debt of 1450.00m. Restoration of affected road surfaces to existing terrain: Asphalt: approximately 3460.00m; Macadam: approximately 150.00m. The routes are entirely and only within the regulatory boundaries of the settlement. The collected water quantities that are submitted to the settlement will be provided as initial information for the preparation of the technical design. The technical specification details the diameters and types of pipes that have the required hydraulic conductivity and must adhere to the specified diameters. The old depreciated pipes shall be replaced by equivalent PEF PN10 SDR17. All water mains that are subject to reconstruction are with the routes entirely and only within the regulatory boundaries of the settlement, which does not require the preparation of a DDP-PP or a DDP-planning scheme. The routes to be reconstructed are only on public municipal territory. Where there is passage through a drainage gully of a technical design phase, a means of passage shall be provided. The routes do not pass through specific infrastructures. The technical specification describes in detail the lengths and diameters that are equivalent to the amortised water supply network, which is sufficient for the analysis of the newly designed network. Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/533081
https://app.eop.bg/today/533081
45332200 - Water plumbing work
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.