-
Published17/07/2023
-
Deadline14/08/2023
-
Today04/03/2026
Utilities
- indicates text translated automatically in your browsing language
Germany-Mönchengladbach: Electronic equipment
NEW mobil und aktiv Mönchengladbach GmbH is planning to build a charging infrastructure for its bus fleet at the site in Rheinstraße 70 in 41065 Mönchengladbach.
19 charging points with 150 kW DC output power each must be provided in the bus depot. For this purpose, a customer station is installed on site. The charging power of the nineteen charging points must be controllable via a load management system. Such a system shall be supplied by the Contractor, bearing in mind that each charging point shall be powered by a separate connection cable.
Another component is the technical management including maintenance of the charging infrastructure as well as the plant responsibility. The period is 12 years, starting with commissioning.
https://www.subreport.de/E39576984
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.