Industrial area Saarlouis Roden - Lot 3: Former Ford SLS premises – Compound here: Dismantling of land - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Industrial area Saarlouis Roden - Lot 3: Former Ford SLS premises – Compound here: Dismantling of land Text automatically translated in your browsing language Automatically translated

  • Published
    26/05/2025
  • Deadline
    02/06/2025
  • Today
    22/06/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
gwSaar
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEC01 Regionalverband Saarbrücken
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
Not available
Description

At Ford's Saarlouis plant, Ford will cease production of the FOCUS by November 2025. Activities with a workforce of around 1,000 people are expected to remain on the site by 2032. The entire site consists of the actual plant and the Ford Industrial Supplier Park ‘FISP’. The plant will gradually be reduced in area to an area called ‘Ford 1000’. In order to make the freed-up areas ready for construction for the Ravensburg pharmaceutical company Vetter, a gradual dismantling of the areas and the infrastructure on them is necessary. This gradual dismantling will start at the winter storage area ‘WSP’ and the subcontractor area ‘NU area’ (lot 1), followed by the area ‘Compound’ (lots 2 & 3) and in the last step of the area of final production ‘Assembly’ and a development road, the ‘Saarland Corridor’ as further lots. The present sub-measure in the overall area of industrial area Saarlouis Roden (ISR) is referred to as ‘Compound area, dismantling of areas Lot 3: Provision of construction services’. Within the scope of these services, it is planned to remove the surfaces, including the underlying base courses (HO gravel), to store them temporarily on supply surfaces and, if the materials are suitable for replacement, to take them up again after appropriate treatment and install them professionally. If they are no longer needed, the existing infrastructural installations (channels, water pipes, separators, etc.) must be professionally taken out of operation and dismantled to a depth of 1.00 m below the surface of the site. The compound consists of 2 areas, the compound north (component 1A) and compound south (component 1B). During the dismantling of the areas, the dismantling of the buildings located in the compound area will take place. The ANs of the respective lots 2 and 3 must coordinate and ensure a smoothly functioning construction process. For further details, see point II. 1. 23. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://www.subreport.de/E46843812
Tenders may be submitted
Electronic submission: required
https://www.subreport.de/E46843812
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Award method
Criterion:
Type: quality
Description: Gewichtung: 50%
Weight (percentage, exact):
Criterion:
Type: price
Description: Gewichtung: 50%
Weight (percentage, exact):
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.