-
Published11/11/2024
-
Deadline13/12/2024
-
Awarded04/04/2025
-
Today25/06/2025
Utilities
- indicates text translated automatically in your browsing language
The cycle path Papírenská ul. – J. Buděšínské ul., Č. Budějovice – processing of PD Text automatically translated in your browsing language Automatically translated
The subject of the contract under the name ‘Cyklostezka Papírenská ul. – J. Buděšínské ul., Č. Budějovice’ – PD processing’ is the elaboration of project documentation for the project authorisation, project documentation for the implementation, the provision of engineering activities for the grant of the project authorisation, a list of works, supplies and services with a statement of area (detailed items), including an award-winning list of works. The subject of performance also includes the supervision of the designer during implementation. This is a common path for pedestrians and cyclists, which is designed on the site of a part of the existing railway siding of Mondi Bupak s.r.o., for which a Decision – Removal of construction is issued and should therefore be removed. The path is designed in a total length of about 330 m and a total width of 5 m, while the width of the footpath will be 2.0 m, the width of the path for cyclists also 2.0 m. Between the paths is designed a strip with greenery and perennial beds in a width of 1 m. Papírenská Street is crossed by MK at the site of the footpath using a pedestrian crossing at the junction Lidická x Papírenská, which will be controlled by the SSZ. The cycle path crosses this road with a separate crossing for cyclists pushed further away from the junction. The route starts with a connection to the project of a path for pedestrians and cyclists at the intersection of Lidická x Papírenská and continues at the railway siding. At Jungmannova Street, there is an undivided path for pedestrians and cyclists as part of the ‘Renovation of Jungmannova Park’ event. The trail continues in the place of the railway siding up to J. Buděšínské Street. The subject matter of the project also includes ensuring coordination with the project of the trail with projects of follow-up projects, namely ‘Renovation of Jungmann Park – Design of a cycle path’ and ‘Removal of a part of the Mondi Bupak siding – Operation of Rožnov in České Budějovice’. The project also includes the processing of replacement plantings and the design of a green belt between a bicycle path and a pedestrian path. As part of the follow-up project documentation, the distribution of replacement plantings and the determination of the type of such plantings will be determined. The basis for the elaboration of the project documentation will be: • Study entitled "Study of a walking and cycling path between the streets of Papírenská X J. Buděšínské, České Budějovice" of 06/2024. • The author of the study is AKIPROJEKT s.r.o., F. Gerstnera 2151/6, 370 01 České Budějovice, ID: 02773961. Part of the work is also: • Project preparation: - securing of all input materials - geodetic survey - geological survey - all other surveys and surveys that the designer expects based on his professional experience - green passport - due to the categorization of the milled part of the road will be part of the asphalt analysis - due to the "contact" with the railway body, the analysis/evaluation of the possible occurrence of hazardous substances or hazardous waste - processing of DIO. • Discussion of the project documentation at all stages with the administrators (owners) of the civil engineering networks concerned, including the relevant departments of the Municipality of České Budějovice, and subsequent incorporation of their requirements into the project documentation, including the Police of the Czech Republic-DI. • Discussing project documentation with landowners if the land on which the construction will be located is not owned by the city and securing their consent to the construction. • Ensuring the issuance of relevant decisions or other measures by public authorities for the implementation of the construction to the extent required by the required PD levels according to the contract. • Cooperation with the contracting authority in the evaluation of the tender for its own contractor. • Synergies in the drafting of tender documents and the assessment and evaluation of tenders. • Checking the budgets of the participants in the public procurement procedure for the implementation of the construction according to the client's instructions. • Processing the response to requests for explanations of project documentation for construction, always within 3 working days from the date on which the request for additional information is forwarded by the client. • Coordination with new investments related to this area of interest, either implemented or in the perspective – e.g. implementation of planned modifications of individual network managers. Text automatically translated in your browsing language Automatically translated
https://www.egordion.cz/nabidkaGORDION/profilgordionBudejovice
https://www.egordion.cz/nabidkaGORDION/profilgordionBudejovice
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.