Li-ion battery storage facility in Crucea Nord Wind Farm Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The object of the work is the implementation of state-of-the-art technical solutions in the field of electricity storage in batteries of accumulators associated with the production of electricity in wind turbines and, at the same time, the integration of the electricity storage facility in the existing facilities at CEE Crucea. - the design, manufacture, assembly, testing and commissioning of the storage unit, including the fulfilment of the conditions for connection to the NES required by the Transmission and System Operator ‘Transelectrica’ and the qualification to provide system services in accordance with the ANRE technical and legislative framework; - making the interface with the existing installations; - carrying out the construction-assembly works in compliance with the requirements of quality, health and safety at work, environmental protection in accordance with the legislation in force. In accordance with the provisions of Article 172(2) of Law 99/2016, as subsequently amended and supplemented, the Contracting Entity shall set a deadline within which it will respond (CONSOLIDATED) in a clear and complete manner to all requests for clarification/additional information, as follows:1. LIMITED DEADLINE FOR CLARIFICATIONS:- 18 days before the deadline for submission of Offers; 2.LIMITED TIMELINES FOR CONSOLIDATED REPLY: The contracting entity will respond clearly and completely to all requests for clarifications/additional information on the 12th day before the deadline for submission of tenders; The deadline for replying to the clarifications has been set so that the economic operators have an adequate period for analysing the tender documentation and, subsequently, for drawing up the tenders in the light of the replies provided by the Contracting Entity. Economic operators interested in this procedure may request clarifications on the tender documentation including the SPECIFICATIONS no later than the deadline specified above. The contracting entity reserves the right not to respond to clarifications regarding the award documentation, sent after the date specified above, regardless of the subject of these clarifications. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
45317000 - Other electrical installation work
79930000 - Specialty design services
42961200 - Scada or equivalent system
31434000 - Lithium accumulators
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
Postal address:
Town: Bucuresti
Postal code: 020276
Country:
Official name: Prime Batteries Technology
Postal address:
Town: Cernica
Postal code: 077035
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.