Published17/12/2013
-
Deadline04/02/2014
-
Opening of tenders05/02/2014
-
Today23/08/2026
Utilities
- indicates text translated automatically in your browsing language
Netherlands-Middelburg: Construction work for water projects
The soil before and behind the East Shelter is protected from erosion for 600-700 metres on both sides by soil protection. On both sides of the East Shelter, excavation ponds are formed behind the edges of the existing soil protection. These were provided for in the design of the Oosterscheldekering. These excavation silage have developed on both sides of the Eastern Shelter. In order to ensure that soil protection can continue to fulfil its current function adequately, it should be avoided that it can saturate, erode, rinse, slip or become damaged. It is therefore necessary to carry out shrubs in situ.
Framework agreement with several operators
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.