-
Canceled30/05/2024
-
Today10/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Design & Build Multifunctional Swimming Pool Beuningen
The realization of new construction of swimming pool De Plons in the municipality of Beuningen. The Swimming Pool replaces the current swimming pool De Plons at a new location. The main elements of the contract are as follows: • Carrying out the design and consultancy work required for the realization of the project in accordance with the demand specification; • Realisation of the new building; • Active aftercare of 24 months; • Optimization of energy over a period of 24 months. See also the Selection Guide 'Design & Build Multifunctional Swimming Pool Beuningen'. 0,01
09000000 - Petroleum products, fuel, electricity and other sources of energy
45200000 - Works for complete or part construction and civil engineering work
71000000 - Architectural, construction, engineering and inspection services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.