Publications Office of the EU
‘Performance of construction supervision in the execution of construction and installation works on construction: ‘Construction of Box 2 of the “Regional Waste Management Centre - Stara Zagora Region”’ - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

‘Performance of construction supervision in the execution of construction and installation works on construction: ‘Construction of Box 2 of the “Regional Waste Management Centre - Stara Zagora Region”’

  • Published
    13/08/2025
  • Deadline
    15/09/2025
  • Opening of tenders
    16/09/2025
  • Awarded
    12/11/2025
  • Today
    08/09/2026
Status
Awarded
Type of contract
Services
Subject for Renewal
No
Buyer
ОБЩИНА - СТАРА ЗАГОРА
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: BG344 Стара Загора
Business sector (Main CPV)
71521000 Construction-site supervision services
Total estimated contract value (excluding VAT)
50,000.00 BGN
Total final contract value (excluding VAT)
Not available
Tender reference number
516214
Description

‘Performance of construction supervision in the execution of construction and installation works on a construction site: ‘Construction of Box 2 of the ‘Regional Waste Management Centre – Stara Zagora Region’ The site has been designated as a second category of construction – pursuant to the Spatial Development Act, Article 137(2)(d) (waste treatment facilities and installations). The contractor performs supervision during construction of all types of construction works, which are performed by the builder, in accordance with the legal powers and obligations of the contractor as a person exercising construction supervision of a construction in accordance with Article 168 of the Spatial Development Act, including: Legal start of the construction according to Art. 157 of the Spatial Development Act, including opening of the construction site, preparation and registration of an Order Book and notification of all specialized control bodies; Controlling the completeness and correct drafting of acts and protocols during construction; Carrying out control on compliance with the requirements for health and safety at work in construction; Suspension of construction works carried out under the conditions of Article 224(1) and Article 225(2) and in breach of the requirements of Article 169(1) and (3) of the Spatial Development Act. Carrying out control on compliance with the requirements for health and safety at work in construction; No damage to third parties and property as a result of construction. The person exercising construction supervision shall sign all acts and protocols during construction, necessary for the assessment of the construction works, regarding the safety requirements and for lawful execution, according to an ordinance of the Minister of Regional Development and Public Works for the acts and protocols drawn up during construction. The prescriptions and orders of the person exercising construction supervision, entered in the order book, are mandatory for the builder, the developer and the technical manager of the construction. Objections to the prescriptions of the person exercising construction supervision may be made within 3 days before the bodies of the Directorate for National Construction Control, and until their pronouncement the construction shall be suspended. After an inspection, the bodies of the Directorate for National Construction Control issue binding instructions. In case of violation of the technical rules and regulations, the person exercising construction supervision is obliged to notify the regional directorate for national construction control within 3 days from the establishment of the violation. After completion of the construction and assembly works, the person exercising construction supervision shall draw up a final report to the Contracting Authority. The final report must be drawn up and stamped by the person exercising construction supervision and signed by the manager of the consulting company and by all qualified specialists designated for supervision of the construction on the relevant parts. The activities and requirements for the implementation of the object of the order are described in the Technical Specification Note: ***Important: Everywhere in the technical specification, documentation and documents where reference is made to a particular model, source or specific process which characterises the products offered by a particular potential contractor, or to a trade mark, patent, type or specific origin or production which would have the effect of favouring or eliminating certain persons or certain products, shall be read and understood with the addition «or equivalent»

Submission Method
Electronic via:
https://app.eop.bg/today/516214
Tenders may be submitted
Electronic submission: required
https://app.eop.bg/today/516214
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
16/09/2025 14:15
Award method
най-ниска цена
Estimated value
50,000.00 BGN
Final contracted value
Not available
Award of contract
Official name: БУЛКОНС ГРУП ООД
Postal address:
Town: гр. София
Postal code: 1680
Country:
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.