Publications Office of the EU
Design services for the Technical Project phase, technical assistance from the designer and execution of works for the rehabilitation of the primary heat networks, for the investment objective "Rehabilitation of the transport heat networks to increase the energy efficiency of the district heating system in Bacău Municipality" SMIS 153247 - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Design services for the Technical Project phase, technical assistance from the designer and execution of works for the rehabilitation of the primary heat networks, for the investment objective "Rehabilitation of the transport heat networks to increase the energy efficiency of the district heating system in Bacău Municipality" SMIS 153247 Text automatically translated in your browsing language Automatically translated

  • Awarded
    17/06/2025
  • Today
    10/07/2025
Status
Awarded
Type of contract
Works
Subject for Renewal
No
Buyer
MUNICIPIUL BACAU
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: RO211 Bacău
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Number of lots
2
Tender reference number
4278337_2023_PAAPD1405670
Description

The subject-matter of the contracts resulting from this procedure is the preparation of the design documentation for the DTAC and PTh phase and the execution of all the works identified in the tender specifications and the Technical Project for the execution of the works drawn up following the award of the contract, for each of the two procurement lots (respectively Lot 1 – Tronson 1 and Tronson 4 – 6.673 Km network, Lot 2 – Tronson 2 and Tronson 3 – 2.307 Km network and includes but is not limited to: - drawing up documentation to obtain all the necessary permits and authorizations from all the local, regional and national authorities required in the Urban Planning Certificate and obtaining them; - development of the project/technical documentation for obtaining the Building Permit (PAC/DTAC); - preparing the documentation for obtaining the ISCIR preliminary approval for the pipelines/supply to be used in the execution of works and which are under the ISCIR scope (if applicable); - drafting the Technical Project for the execution of the works and the Execution Details, with the endorsement of the Certified Technical Verifiers and the CTE Opinion of the SACET Operator; - elaboration of the execution details; - elaboration of the Safety and Health Plan on the site; - preparing the AS-BUILT Documentation; - drawing up the Technical Book of the construction and the installations (ducts) made; - drawing up all the memos and substantiation notes requested during the design and execution phase of the works, both for the proper continuation of the execution of the works and at the request of the LIOP financier (LIOP MA) or other authorities; - ensuring throughout the execution of the works the technical assistance from the Designer; - the purchase of all materials and products, all machinery, means and equipment (including any lifting or handling equipment) necessary for the execution of the works; - securing any temporary activities or works necessary for the preparation of the site, or any authorisation required of the Contractor from the competent authorities for the execution of the works and the carrying out of the temporary activities and works; - the transport to the construction site of any materials, machinery, components and work equipment, of any normal or extraordinary means necessary for the execution of the works; - any relevant tests and tests, such as these tests and tests required by legislation and regulations in the field of construction quality assurance system; - ensuring any consumables necessary for the execution of the works and carrying out the tests; - maintenance of the works until they are handed over to the Contracting Authority; - providing the activities and consumables necessary to keep the site clean and functional, as well as the activities and consumables necessary for the assembly, dismantling and removal of any temporary works; - the preparation of any documentation required by the Contractor for the execution of the works, including, but not limited to: - general charts for the realisation of the public investment (physical and value); - the quality plan for execution; - the quality control plan; - certifications and test results of materials; - development of manuals and operating instructions. Text automatically translated in your browsing language Automatically translated

Submission Method
Not available
Tenders may be submitted
Not available
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.