-
Published20/09/2024
-
Deadline15/11/2024
-
Today15/07/2025
Utilities
- indicates text translated automatically in your browsing language
B23-05247-PDA studies and ECC works as part of the rejuvenation of the DEGAINAGE health chain Text automatically translated in your browsing language Automatically translated
FARM BENEFITS - ITEM 1: Carrying out the DPA studies, the overall documentation and details, the FEMDAM instructions and the implementation studies concerning the new Health Chain and its RCT. - ITEM 2: Integration of the elements of the new TCR architecture and the new Electrical Distribution architecture. - ITEM 3: Integration of the elements of the new network infrastructure and RP hardware in the zone. - ITEM 4: Qualification tests, commissioning and probationary operation of the new Health Chain. - ITEM 6: Decommissioning, ilotage and electrical isolation of the non-renewed equipment of the former Health Chain and its control-command system. - ITEM 7: Drafting RFI + constitution of the DOE. CONDITIONAL BENEFITS - ITEM 5: Requalification of the "environment" channels and switch to the new Supervision. OPTIONAL BENEFITS - Option 1: Removal of totally non-reusable materials and equipment from the current health chain, which has become obsolete following the commissioning of the new health chain + packaging into waste and disposal UNIT PRICE BENEFITS Unit price (PU) services concern the following work units: PU n°1 - Site cleanliness. PU n°2 - Extended working hours. PU n°3 - Carrying out work in teams 2 x 8. PU n°4 - Work carried out in staggered timetables. PU n°5 - TQC statement for document update. PU n°6 - Unannounced partial replacement of site. PU n°7 - Extended safety of the site over a period of more than 3 days following an unannounced stoppage. PU n°8 - Extended safety of the site between phase 2 and phase 3 tests due to delay in the delivery of radiation protection beacons. PU n°9 - Evolution of radiological conditions – wearing active clothing (AT). UP No 10 – Changes in radiological conditions – wearing of ventilated clothing (TV). PU n°11 - Asbestos work. PU n°12 - Assembly and dismantling in UT of a mobile scaffolding. PU n°13 - Assembly and dismantling in UT of a fixed scaffolding. PU n°14 - Processing of a communication channel. PU n°15 - Processing of 3 TOR information in automaton input. PU n°16 - Processing of a programmable component input measurement. PU n°17 - Added programmable component input card and associated pre-cabling modules. PU n°18 - Addition of local signage. PU n°19 - New way of Supervision. PU n°20 - Installation and commissioning of additional PR beacon for irradiation or contamination measurements. PU n°21- Installation and commissioning of an additional PR beacon for aerosol measurements. PU n°22- Installation of an addressable connection box for mobile beacon. PU n°23 -Installation of an additional ripping box. PU n°24 - Installation of an intermediate electrical distribution box. PU n°25 - The installation of an additional cable tray. PU No 26 – Assistance to the operator in carrying out phase 3 tests. PU n°27- Daily solicitation of an automatic/computer expert. PU n°28 - Daily solicitation of an electrician. PU n°29 - Shutdown and islanding of additional equipment. PU n°30 - Resumption of security / FEM DAM file following a change in the level of authorisation. PU n° 31 - Completion of an additional FEM DAM level CI or DIR. PU n° 32- Completion of a FEM DAM additional ASND level. Text automatically translated in your browsing language Automatically translated
www.marches-publics.gouv.fr
www.marches-publics.gouv.fr
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.