-
Awarded27/07/2026
-
Today19/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Design of an automation and control system for the Varna substation
The order is for a complex service, including design and implementation of author's supervision during the implementation of the automation and control system of the substation "Varna". The design of the automation and control system of the Varna substation will be carried out in volume and scope in accordance with the Technical Specification. The design will be implemented in six stages: First stage – 400kV system; Second stage – 220 kV system Third stage – 400kV reactor; Fourth stage – temperature, position of step regulators and AT cooling systems; Fifth stage - medium voltage systems; Sixth Stage - Central Signalling, Own AC Needs, Own DC Needs. The contract is part of the implementation of the CARMEN Investment: Smart grids increasing RES and interconnectivity in the South East Europe region", co-financed with funds from the Connecting Europe Facility.
71323100 - Electrical power systems design services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.