Publications Office of the EU
Renovation of tram infrastructure in Podwale Przedmiejskie Street and reconstruction of the bridge over the Stara Motława River in Podwale Przedmiejskie Street in Gdańsk - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Renovation of tram infrastructure in Podwale Przedmiejskie Street and reconstruction of the bridge over the Stara Motława River in Podwale Przedmiejskie Street in Gdańsk Text automatically translated in your browsing language Automatically translated

  • Published
    13/10/2025
  • Deadline
    14/11/2025
  • Opening of tenders
    14/11/2025
  • Today
    15/11/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
Dyrekcja Rozbudowy Miasta Gdańska działająca w imieniu i na rzecz Gminy Miasta Gdańska
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL633 Trójmiejski
Business sector (Main CPV)
45200000 Works for complete or part construction and civil engineering work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
134/BZP-U.510.118.2025/MKL
Description

1. The subject of the contract is the implementation of an investment task entitled: Renovation of tram infrastructure in Podwale Przedmiejskie Street and reconstruction of the bridge over the Stara Motława River within Podwale Przedmiejskie Street in Gdańsk. The contract is divided into two scopes: Scope 1 includes the design-and-build task for the task: ‘Renovation of the existing tram infrastructure within ul. Podwale Przedmiejski’, of which: - replacement of existing track infrastructure elements: rails, auxiliary and basic supports, string concrete sleepers, - replacement of existing traction infrastructure elements: load-bearing structures, load-bearing ropes, contact wires, etc., together with all the elements necessary for the proper functioning of traction, - track centre adjustment - offset between tracks in sections subject to replacement of track infrastructure, - track adjustment on sections excluded from renovation, - repair of track drainage, - painting of existing traction and traction and lighting poles, - preparation of elements of future passage through the track - making a two-way passage through the tracks in the technology of concrete prefabricated crossings, - dismantling one and assembly of two poles (one traction and the other traction and lighting), - replacement of the edges of 4 pairs of tram platforms, - replacement of the surface with the construction of 4 tram platforms, - replacement of barriers separating platforms from the carriageway, - insulation of underground passages of 3 pedestrian tunnels together with insulation under the carriageway for one tunnel - implementation and maintenance for the duration of the task of temporary traffic organization, - establishment of a new low-greenery in the lane of the separation between the carriageways, reconstruction of possible damage in land use, As part of the task, complete design documentation should be made together with decisions enabling the implementation of works and execution of construction works on this basis, in accordance with the scope described in the Functional and Utility Program. Scope No. 2 includes the execution of construction works for the task of: ‘Reconstruction of the bridge over the Stara Motława River within ul. Podwale Przedmiejski’ according to the design documentation by YLE INŻYNIEROWIE Sp. z o.o., including: - Reconstruction of the engineering structure, - Reconstruction of the road-track system, - Reconstruction of the overhead contact line, - Reconstruction of lighting, - Reconstruction of induction loops, - Reconstruction of the rainwater drainage system, - Reconstruction of the water supply network, - Reconstruction of the technological channel. 2. As part of the performance of the subject-matter of the contract, the contractor will obtain a permit to use the works covered by the subject-matter of the contract. 3. The detailed scope of the contract and the conditions of implementation are set out in the Description of the subject of the contract (OPZ), constituting Annex 8 to the FTZ. The other conditions for the performance of the contract are set out in the draft provisions of the public procurement contract, which constitute Annex 9 to the FTZ. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://platformazakupowa.pl/transakcja/1191094
Tenders may be submitted
Electronic submission: required
https://platformazakupowa.pl/transakcja/1191094
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
14/11/2025 11:10
Place of performance
Award method
Przedłużenie minimalnego okresu gwarancji jakości dla II, III, IV i V przedmiotu odbioru - 40%
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.