‘Engineering (design, author’s supervision and construction and installation works) for a site: Rehabilitation and reconstruction with replacement of water supply on Ljule Burgas Street in the section from Georgi Zhechev Street to Chavdar Voyvoda Street, Harmanli. Text automatically translated in your browsing language Automatically translated

  • Published
    06/11/2024
  • Today
    08/12/2024
  • Deadline
    10/12/2024
  • Opening of tenders
    11/12/2024
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
ОБЩИНА ХАРМАНЛИ
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: BG422 Хасково
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
432,500.00 BGN
Total final contract value (excluding VAT)
Not available
Tender reference number
440155
Description

‘Engineering (design, author’s supervision and construction and installation works) for a site: ‘Rehabilitation and reconstruction with replacement of water supply on Ljule Burgas Street in the section from Georgi Zhechev Street to Chavdar Voyvoda Street, Harmanli. SHORT DESCRIPTION OF THE ACTIVITIES IN THE SCOPE OF THE ORDER: 1. PROJECTION; 2.AUTO SURVEILLANCE; 3.SURVEILLANCE of the site “Rehabilitation and reconstruction with replacement of water supply on Ljule Burgas Street in the section from Georgi Zhechev Street to Chavdar Voyvoda Street, Harmanli.The contracting authority shall set a maximum permissible period for the execution of the contract of up to 180 calendar days, of which up to 30 calendar days for the preparation of an investment project in the technical phase and up to 150 calendar days for the execution of the construction and installation works. The deadlines for implementation of the activities are at the proposal of the participant. The deadlines proposed by the participants should not be beyond the maximum deadlines specified by the Contracting Authority. In case of discrepancy of any of the deadlines specified by the Contracting Authority, the bid of the participant will be eliminated from further participation in the procedure. 1. The deadline for elaboration of an investment project at the stage technically begins to run from the date of receipt of a commissioning letter for the start of the activity of preparing a technical project by the CONTRACTING AUTHORITY and is until the submission of the prepared project by the CONTRACTING AUTHORITY to the CONTRACTING AUTHORITY with a handover protocol. The deadline for preparation of the project does not include the time for coordination of the prepared project with the competent authorities/persons and the operating companies, as well as all other coordination deadlines. 2. The deadline for the execution of construction works starts to run from the date of signing the Protocol on the opening of a construction site and the determination of the construction line and level (Annex 2 to Article 7(3)(2) of Regulation No 3/31.07.2003 on the drawing up of acts and protocols during construction) until the signing of the Statement of Findings establishing the suitability for acceptance of the construction (Annex No 15, in accordance with Regulation No 3/31.07.2001 on the drawing up of acts and protocols). 3. Deadline for exercising author's supervision - from the signing of the Protocol on the opening of a construction site and the determination of the construction line and level (Annex 2 to Article 7(3)(2) of Regulation No 3/31.07.2003 on the drawing up of acts and protocols during construction) to the signing of the Statement of Findings establishing the suitability for acceptance of the construction (Annex 15, pursuant to Regulation No 3/31.07.2001 FORECAST VALUE OF THE ORDER: BGN 432 500.00 excluding VAT, as for the individual activities the price is as follows: -the maximum financial resource for the implementation of rehabilitation and reconstruction of the street is BGN 254 766.67 excluding VAT; -the maximum financial resource for replacement and construction works of water supply is BGN 144 400.00 excluding VAT; -the maximum financial resource for design is BGN 31 666.66 excluding VAT; -the maximum financial resource for the exercise of author's supervision is BGN 1 666.67 excluding VAT. Source of funding IMPORTANT!!! At the time of the opening of the procedure, no funding was provided for the activities that were the subject of the contract. In this regard, and in accordance with Article 114 of the Public Procurement Act, the performance of this public procurement will be deemed to have been awarded under the suspensive condition of providing targeted funding. In the event that such funding is not provided, the contract concluded between the Assignor and the Contractor may not be performed. In such a case, either party may terminate the contract unilaterally without notice after the expiry of three months from its conclusion and the parties shall not be liable to each other for damages or loss of profit.’ For this reason, the implementation starts after confirmation by the contracting authority of the secured funding and presentation by the contractor of the specified performance guarantee. If the performance guarantee is not provided within the period specified by the contracting authority, without objective reasons, the contracting authority shall terminate the contract. Either party to the contract may request termination of the contract without notice after the expiry of a period of three months from the conclusion of the contract. If, after a period of 10 months from the conclusion of the contract, no financing is provided, the contract shall be considered terminated. PLACE OF IMPLEMENTATION OF THE ORDER: The length of Ljule Burgas street is approximately 760 m in the section from Georgi Zhechev Street to Chavdar Voyvoda Street, Harmanli. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://app.eop.bg/today/440155
Tenders may be submitted
Electronic submission: required
https://app.eop.bg/today/440155
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
11/12/2024 15:00
CPV code
Award method
Финансов показател (ФП) - 40%
Estimated value
432,500.00 BGN
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.