-
Published11/11/2024
-
Deadline19/12/2024
-
Opening of tenders19/12/2024
-
Today22/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Areas of application for four-armed junctions in the course of EKL 2 roads Text automatically translated in your browsing language Automatically translated
As a rule, the guidelines for the construction of rural roads (RAL) only provide for certain node types for the different design classes (ECL). When connecting roads of EKL 2 with roads of EKL 2 or 3, semi-planned nodes are used. When connecting the ramp to a road of EKL 2, light signalling systems are used in the area of the junction for safety reasons, when connecting the ramp to a road of EKL 3, other solutions, such as a roundabout, can also be used. However, the RAL also permits deviations from the standard cases presented in exceptional cases to be justified. If high travel speeds are desired due to long travel distances, partial plan-free nodes can also be used. However, attention should be paid to continuity in the formation of successive nodes. On the other hand, even level crossings are possible if the traffic is of lesser importance. Both for newly planned roads of the EKL 2 and in the older stock of comparable lines of the interconnection function level LS II, it can be seen that both of these exceptional cases are more common. More recent studies on the operational limits and safety effects of planned and subplanned junctions in the course of EKL 2 roads, which also take into account the different financial costs and area consumption, in particular in the case of intersection structures, therefore do not exist. The aim of the research project is to define the operational limits of the different junction types in the course of roads of EKL 2 more clearly and to find a clearer demarcation. Road safety, traffic quality as well as cost-effectiveness and sustainability aspects for the node types and their environment are to be taken into account. Based on the knowledge gained in this way, recommendations are to be derived as to whether and to what extent the requirements of the RAL must be adapted. Text automatically translated in your browsing language Automatically translated
https://www.evergabe-online.de/tenderdetails.html?id=728181
https://www.evergabe-online.de/tenderdetails.html?id=728181
73000000 - Research and development services and related consultancy services
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
45233000 - Construction, foundation and surface works for highways, roads CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.