-
Published29/10/2025
-
Deadline14/11/2025
-
Opening of tenders14/11/2025
-
Today18/05/2026
Utilities
- indicates text translated automatically in your browsing language
Construction work for the Piétrebais collector
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
This contract is a works contract. This contract includes the execution of the works: The contract is carried out on a Type IIIa network. For collector work (divisions 1, 2, 12, 13 and 14), provision is made for: - all works, services, supplies and requirements necessary for the complete construction of a waste water manifold, storm overflows, sewerage, pumping stations and discharge pipes: - preparatory work for the felling and preparation of land; - partial or total dismantling/demolition of the road; - water depletion works; - The laying of gravity pipes in open trenches; - The laying of discharge pipes in open trenches; - Crossings of watercourses with repair of banks by the laying of rock; - The use of special armour; - Possible floor replacements; - Possibility of laying pipes on piles and slabs; - Installation of prefabricated inspection chambers; - The construction of storm dumps in place, including associated accessories; - The installation and commissioning of three complete prefabricated pumping stations; - Repairs to complete or partial roads, ploughs, banks and surrounding areas affected by the works; - The installation of a re-use outlet from the site; - The installation of hydrocarbon concrete or discontinuous concrete coatings; - All works, supplies and costs not listed in the special specifications or on the plans, but deriving directly or indirectly from those described in the special specifications and its annexes, such as miscellaneous costs, signalling and safety measures, the repair and maintenance of the works during the warranty period, the replacement of defective supplies, etc. For dripping works on the territory of the Commune d’Incourt (division 3, 4, 5, 6, 7 and 8), provision is made for: - partial or total dismantling/demolition of the road; - water depletion works (planned in the collector works); - The laying of gravity pipes in open trenches to be laid on roads; - Placing on piles and any slabs; - Installation of prefabricated inspection chambers on the drain; - The laying of linear elements; - The installation of new drains and their connection; - The implementation of a drainage sub-foundation on the road with drainage regularly connected to the watercourse; - The implementation of a road foundation; - The laying of bituminous coatings; - Installation of special connections as well as private CVs. - All works, supplies and costs not listed in the special specification or on the plans, but deriving directly or indirectly from those described in the special specification and its annexes, such as miscellaneous costs, signalling and safety measures, the repair and maintenance of the works during the warranty period, the replacement of defective supplies, etc. For dripping works on the territory of the Municipality of Grez-Doiceau (divisions 9, 10 and 11), provision is made for: - the dismantling/demolition of the road; earthworks for the creation of a new concrete pavement; - water depletion works (planned in the collector works); - The laying of gravity pipes in open trenches to be laid on roads; - Rehabilitation of existing sewerage sections but requiring repairs; - Placing on piles and any slabs; - Installation of prefabricated inspection chambers on the drain; - The laying of linear elements; - The installation of new drains and their connection; - The implementation of a drainage sub-foundation on the road with drainage regularly connected to the watercourse; - The implementation of a road foundation; - The laying of bituminous coatings; - Installation of special connections as well as private CVs. - All works, supplies and expenses not included in the special specifications or on the plans, but deriving directly or indirectly from those described in the special specifications and its annexes, such as miscellaneous expenses, signalling and safety measures, the repair and maintenance of the works during the warranty period, the replacement of defective supplies, etc. For the works on the Pimaci, the fitting-out of a sidewalk at Rue Marcel Louis, provision is made (Division 16): - the dismantling/demolition of the shoulder; earthworks for the creation of a new concrete pavement; - The supply and installation of linear elements; - The implementation of a sub-foundation and a pavement and road foundation; - The supply and installation of concrete paving; - The supply and installation of podotactile slabs; - Execution of grassing; - The supply and installation of street furniture; - The making of markings; - All works, supplies, costs not included in the special specifications or on the plans, but deriving directly or indirectly from those described in the special specifications and its annexes, such as miscellaneous costs, signalling and safety measures, restoration and maintenance of the works during the warranty period, replacement of defective supplies, etc. Under this contract, the contracting authority intends to combat social dumping and social fraud. Important remarks: 1.The requirements of the CCT Qualiroutes for civil engineering contracts shall apply to this contract. 2. As the market is above €750,000 htva, the entrepreneur will make sure to strengthen social cohesion and sustainable development by making an effort...
https://www.publicprocurement.be
https://www.publicprocurement.be
Type: cost
Description: Prix
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.