-
Published29/10/2025
-
Today15/11/2025
-
Deadline09/12/2025
-
Opening of tenders09/12/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Tile and concrete work Text automatically translated in your browsing language Automatically translated
cleaning of the substrate; Floor: approx. 310 m2; cleaning of the substrate; Wall: approx. 1310 m2; Filling and finishing of screeds, 20mm: approx. 55 m2; ground for detention; Floor: approx. 310 m2; ground for detention; Wall: approx. 1310 m2; Equalize substrates Floor area: approx. 85 m2; Slope tray for floor drain: approx. 55 pcs; Cut protection tape: approx. 550 m; Surface sealing on wall surfaces: approx. 1090 m2; Surface sealing on floor surfaces: approx. 270 m2; Sealing tape for corners: approx. 1100 m; Inside - outside corners: approx. 235 pcs; Capillary barrier shower/slope area: approx. 180 m; Seal inlets NW 100/100 mm: approx. 55 pcs; Seal water abstraction point: approx. 250 pcs; Seal pipe penetrations: approx. 250 pcs; floor tiles; 10/10 cm thin bed, R10a: approx. 310 m2; Allowance: Design in gradient shower area: approx. 210 m2; Base 10 x 10 cm: approx. 615 m; earthenware tile wall; Thin bed: approx. 1310 m2; earthenware tiles tile shield; Thin bed: approx. 145 m2; ; Supplement to items Wall tiles: approx. 120 m; Permanently elastic joints 5 mm: approx. 1500 m; Permanently elastic joints 5-10 mm: approx. 450 m; Make holes in the wall and floor area as an allowance.: approx. 600 pcs; Anarb. Penetrations up to 150mm: approx. 150 pcs; Finishing profile 12.5 mm: approx. 550 m; Separating rail 10 - 12 mm, V2A: approx. 165 m; Closing rail: approx. 140 m; Transition profile aluminium, height compensation: approx. 140 m; Inspection flap walls: approx. 2 pcs; Remove protrusion from edge strips: approx. 1000 lfm; Close dummy and working joints: approx. 20 m; Protective cover flooring choice AN: approx. 310 m2; Protection floor coverings: approx. 310 m2; Concrete stone floor, stair landings: approx. 360 m2; Concrete stone base: approx. 300 lfm; Steps, straight: approx. 305 pcs; Stair steps, base: approx. 90 lfm; Allowance: Inclined cut concrete block: approx. 40 m; Permanently elastic jointing concrete work stone: approx. 1500 m; Window frame cover, Aglo-Marble-Micro Corn: approx. 270 m; Crystal mirror 60/80: approx. 70 pcs; Allowance: Manufacture drillings crystal mirror: approx. 70 pcs; Supply spare tiles: approx. 1 psch; Reserve concrete work stone supply: approx. 1 psch; Compilation of product data folders: approx. 1 psch Text automatically translated in your browsing language Automatically translated
https://bi-medien.de
https://bi-medien.de
45210000 - Building construction work
45215100 - Construction work for buildings relating to health
45400000 - Building completion work CVP code deduced from the text of the procedure AI-generated
45431000 - Tiling work CVP code deduced from the text of the procedure AI-generated
45430000 - Floor and wall covering work CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Gewichtung: 100
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.