-
Published12/03/2025
-
Today20/04/2025
-
Deadline24/04/2025
-
Opening of tenders24/04/2025
Utilities
- indicates text translated automatically in your browsing language
Commissioning of planning services (traffic systems and civil engineering structures) Text automatically translated in your browsing language Automatically translated
General: The municipality of Großenkneten intends to tender the above-mentioned planning services for the scope of development plan No 141 ‘Huntlosen – Heidkämpe’. The area is located in the district Huntlosen. To the east are the roads ‘Heidkämpe’ and K242 ‘Sannumer Straße’. To the south and in the planning area is the municipal road Fladderskamp’. The size of the planned area covers an area of 5.25 ha. In the eastern part of the planned area, an industrial area is to be created. In the rest of the area a general residential area. South of the area of application, an area for retention is provided. The construction of a kindergarten is conceivable in the general residential area. The preliminary draft of the development plan can be found in the tender documents. The later commissioned development planner is expected to provide support in the context of land-use planning. Close coordination is required. The local building regulations determined in accordance with the development plan must be taken into account in the planning. Participation should take place immediately after the award of the contract. The plans for the development, dirt and surface drainage are to be presented to the municipal administration in the autumn of 2025. Estimated costs shall be established for all designs. A presentation in the technical committee will follow. After completion of the land-use plan procedure, the structural development is expected to take place in II. quarter of 2026. The presentation of the plans or representations should be done at least by presentation on projector. If other presentation media / aids are to be used, the contractor must ensure this on his own responsibility. The plans are intended to identify funding opportunities on the part of the future contractor. If there is a possibility of funding, increased requirements are demanded for a product-neutral preparation of the specifications for the tendering of the trades. Even the mention of products, including the addition of ‘or equivalent’, is not permitted! Gradual commissioning of the performance phases is intended. In the case of a contract, the service phases 1 and 2 HOAI are initially commissioned. Subsequently, the performance phases 3 to 4 and 5 to 8 HOAI take place. Civil engineering structures: The land is currently used for agriculture. A ground survey is available for the development area. This report will be made available after the order has been placed. In the expert report, the soil and water conditions as well as the infiltration capacity were examined. To the south is the "Bullerbäke" floodplain. Here, the surface water can be discharged via a retention. The dimensioning of the entire drainage system including retention shall be determined in accordance with the technical regulations (Worksheet DWA-A 138-1). In the eastern area, there is a connection to a pumping station for the discharge of the waste water generated in the planned area. Whether the entire waste water disposal can be carried out via this pumping station or the construction of another pumping station is required must be checked as part of the planning. In the eastern area of the construction area runs in the north-south direction of a SW pressure line DN 100. As part of the planning, it must be checked whether a transfer of the pressure line is necessary. An excerpt from the sewer with high-altitude systems can be found in the tender documents Transport systems: Each plot of land in the industrial area is accessed via the Heidkämpe road. Further development measures are not necessary from the current point of view. The residential area is accessible via the ‘Fladderskamp’ road. The development of the residential area is divided into two construction phases (initial development and final expansion). After the initial closure, the final expansion takes place in about 4 to 5 years, depending on the construction activity. There is no fixed time frame. In the general residential area, a traffic-calmed expansion is to be created. Street lighting in the residential area must be taken into account. Text automatically translated in your browsing language Automatically translated
https://bi-medien.de
https://bi-medien.de
Type: price
Description: 100 %
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.