-
Published17/09/2024
-
Deadline16/10/2024
-
Today08/07/2025
Utilities
- indicates text translated automatically in your browsing language
Stadtwerke Südholstein Text automatically translated in your browsing language Automatically translated
The drinking water and gas lines as well as the power supply cables medium voltage (MS) and low voltage (NS) in the Datumer Chaussee must be replaced. If not already done, the land connections with ducts Fibre To The Home (FTTH) for pinnau.com will be installed. Specifically, these are the following media outlets: ⁇ Supply pipes drinking water ⁇ Land connections drinking water ⁇ Supply pipes gas ⁇ Land connections gas ⁇ Supply pipes low voltage ⁇ Land connections low voltage ⁇ Supply pipes medium voltage ⁇ Land connections fiber optic (pinnau.com) Text automatically translated in your browsing language Automatically translated
https://bi-medien.de
https://bi-medien.de
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.