Greece-Heraklio Attikis: Turbo-compressors
Design, manufacture, supply, transportation, installation, testing and commissioning of turbo-compressor packages for the high pressure natural gas pipeline. Indicatively each package will be complete with:
— gas turbine and centrifugal natural gas compressor,
— combustion air intake system,
— fuel gas system skid,
— gas turbine dry low emission system,
— gas turbine discharge stack with silencer,
— gas turbine enclosure complete with fire detection and firefighting systems for indoor installation,
— lubricating system for the turbine and for the driven compressor units and lubricating oil cooler,
— water washing system; control cabinet for start-up, speed control, load sharing and anti-surge,
— suction pressure throttling, recycling and anti-surge valves,
— motor control center,
— painting, tracing and insulation,
— packaging and delivery to site,
— full installation on site,
— start-up, commissioning, testing and training,
— all associated ancillary systems,
— installation start-up and commissioning spares.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.