-
Published27/04/2026
-
Deadline27/05/2026
-
Opening of tenders27/05/2026
-
Today18/06/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Modernization GS Dorschbergschule - Preliminary measures Electrical installation works
The Dorschberg primary school in Wörth a. Rh. was built in 1966 and is located behind the middle building of the Carl-Benz comprehensive school in Wörth am Rhein. The primary school consists of four building sections, which include a single or two-storey building section with connecting corridors, as well as a break hall with an administrative wing and a single-storey pavilion building with four pavilion buildings. The buildings are connected with breaks and have two toilet buildings. The one- to two-storey buildings were built in massive construction with prefabricated concrete parts and have flat roofs at different altitudes with surrounding attic and have been renovated and modernized several times to this day. In the mid-1990s, a concrete renovation took place. In this process, a thermal insulation composite system and the Alucobond claddings of the attics and prefabricated supports were installed. Significant structural measures - The existing single-storey class wing will be expanded and the previous inner courtyard area between the two existing class wings will be closed and reconsidered. For this purpose, the insufficiently load-bearing prestressed concrete ceiling above the northern class clock is rebuilt and replaced by a new reinforced concrete solid ceiling. - The new upper floor is built in prefabricated timber construction with load-bearing walls as solid timber construction or wooden stand construction and top floor ceiling as cross-laminated timber construction. - The central auditorium is provided with a glass roof construction. - The prestressed concrete ceiling in the corridor area above the existing crawl cellar of the north wing must be upgraded by steel girders. - Small-scale floor plan changes in the existing building - The pavilions are gutted and converted into an extended covered courtyard area - Improvement of the thermal insulation of all building envelopes (roof surfaces, windows, ventilated wooden facades, cellar ceiling insulation) - Modernization of the technical building equipment including controlled ventilation system with heat recovery, energy-saving lighting systems, building automation, including the digital requirements for school buildings - Optimization of fire protection and implementation of the school protection concept
https://www.subreport.de/E61947313
https://www.subreport.de/E61947313
45311200 - Electrical fitting work
45400000 - Building completion work
45200000 - Works for complete or part construction and civil engineering work
Type: price
Description: Der Bieter mit dem günstigsten Angebot (Bestpreis) erhält den Zuschlag.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.