-
Published27/06/2025
-
Today17/07/2025
-
Deadline29/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Extension of the Erkelenz Mitte fire station, architectural services Text automatically translated in your browsing language Automatically translated
The main station of the Erkelenzer fire brigade was built in the 1990s and is divided into a building with training and administration rooms as well as a vehicle hall. In the administration building, on the ground floor, there is an operational center and a large classroom for training and education, on the upper floor, a former apartment was expanded for office purposes of the full-time employees of the fire brigade, including the Wehrleitung, furthermore, in the building part, rooms of the voluntary fire brigade and on the upper floor, a room for the youth fire brigade. In addition, the entire technical building facilities are located in the basement. The vehicle hall has six vehicle parking spaces as well as a storage area and a washing area. Furthermore, the changing areas are housed in the hall, but without structural separation from the vehicle hall. In the transition area between the two buildings there are washing and toilet facilities as well as a workshop area, which used to be used to host the respiratory protection workshop. The respiratory protection workshop was spun off as a separate building in 2019-20. Planned construction works: As part of the new fire brigade needs plan, it was stipulated that a full-time guard must be set up by 2028. The area of the full-time guard is to be built as a separate building north-east of the existing buildings and on the ground floor, in addition to workshop rooms, a warehouse and a washing room, also the changing rooms and sanitary facilities for the skin service forces are to be preserved. From here, the vehicle hall, which is extended by an axle for two vehicles, is also to be opened up. On the upper floor, the necessary staff rooms including the on-call, leisure and relaxation rooms are to be arranged, a free area in the form of a roof terrace is to complement the leisure areas. Furthermore, the new administration of the fire station is to be arranged on the upper floor. The existing building will be available after the expansion of the voluntary fire brigade. In particular, the area of the existing sanitary facilities on the ground floor, including the former respiratory protection workshop, must be rebuilt and expanded in order to provide new changing rooms for the members of the voluntary fire brigade separately from the vehicle hall. In the outdoor area, a new roundabout is to be provided, on which further parking spaces are to be arranged. The arrangement of the planned extensions is shown in a sketch of the building construction office, which is coordinated by the principle with the fire brigade as user, but the planning is non-binding, and in any case to be specified and adapted. Other design approaches are possible as far as the required rooms and desired usage contexts remain guaranteed. Text automatically translated in your browsing language Automatically translated
https://www.vergaben-wirtschaftsregion-aachen.de/VMPSatellite/notice/CXVHY68YT0BV6L3N
https://www.vergaben-wirtschaftsregion-aachen.de/VMPSatellite/notice/CXVHY68YT0BV6L3N
71240000 - Architectural, engineering and planning services
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.