Published06/06/2025
-
Deadline04/07/2025
-
Today17/07/2025
Utilities
- indicates text translated automatically in your browsing language
New elementary school III, Neufahrn b. FreisingFachplanung Technische Anlagen (HLS) Text automatically translated in your browsing language Automatically translated
In the municipality of Neufahrn near Freising there are currently two primary schools with a total of 34 classes and one to two trains each of the tied full day. Constantly increasing student and class numbers, the designation of new construction areas and the re-densification of existing residential areas as well as the future legal entitlement to a full-time place in the primary school require the construction of another primary school. _____ The new primary school will be built in the immediate vicinity of the middle school, sports hall and swimming pool. The pupils of the newly built primary schools and the middle school will use the premises of the other school as well as the sports hall. The nearby outdoor sports facilities of the municipality are used by the adjacent schools (gymnasium and middle school). Also within walking distance is the traffic practice area, which serves for the bicycle training of primary school students. _____ In order to optimise the planning, the client has conducted a realisation competition. As information, the competition entries of the first three winners of the contract notice are enclosed.Currently, the winner to be commissioned from the competition will be determined in a negotiated procedure according to the VgV. At the same time, the procurement procedures for the technical design of the technical equipment and the structural design are carried out. _____The client attaches particular importance to the cost-effectiveness of the project. The aim is a cost-optimized construction with rational and economical floor plans. The buildings should allow economically reasonable construction costs to be expected through design and material selection and ensure low construction maintenance in the long term, in particular through the use of durable and low-maintenance materials, robust building technology and an economical energy requirement. In addition, special attention should be paid to the planning of a sustainable building: Forward-looking design concepts are expected that achieve the highest possible overall economic efficiency, comfort and architectural quality with the lowest possible use of energy and resources. The aim is a construction method that uses raw materials and energy sparingly and reduces the environmental impact to the lowest possible level. The client energetically strives for an overall concept of architecture and energy efficiency, which first checks the utilisation of passive measures (LowTech principles) before using active measures. In general, the use of local, regenerative energies is sought.According to the current state of knowledge, the municipality of Neufahrn assumes production costs of approximately € 18.87 million (cost group 300 + 400, net). After completion of phase 3 and submission of the cost calculation, a binding cost ceiling will be set.The measure will be publicly funded (proof of use is required). Text automatically translated in your browsing language Automatically translated
https://staatsanzeiger-eservices.de
https://staatsanzeiger-eservices.de
Type: quality
Description: Projektteam - Qualifikation und Erfahrung, Präsenz vor Ort _____ Die Qualität ist nicht das einzige Zuschlagskriterium; alle Kriterien sind in den Vergabeunterlagen (Zuschlagsmatrix) aufgeführt: https://www.staatsanzeiger-eservices.de/aJs/EFormsBekVuUrl?z_param=313031
Weight (percentage, exact):
Criterion:
Type: quality
Description: Auftragsbezogene Qualitätssicherung _____ Die Qualität ist nicht das einzige Zuschlagskriterium; alle Kriterien sind in den Vergabeunterlagen (Zuschlagsmatrix) aufgeführt: https://www.staatsanzeiger-eservices.de/aJs/EFormsBekVuUrl?z_param=313031Das Verfahren ist ausgeschrieben als Verhandlungsverfahren mit Teilnahmewettbewerb ohne Ausarbeitung eines Lösungsvorschlags. Lösungsvorschläge sind nicht verlangt und werden nicht bewertet.
Weight (percentage, exact):
Criterion:
Type: price
Description: Honorarangebot _____ Der Preis ist nicht das einzige Zuschlagskriterium; alle Kriterien sind in den Vergabeunterlagen (Zuschlagsmatrix) aufgeführt: https://www.staatsanzeiger-eservices.de/aJs/EFormsBekVuUrl?z_param=313031
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.