-
Published17/03/2026
-
Deadline22/04/2026
-
Opening of tenders22/04/2026
-
Awarded02/06/2026
-
Today31/08/2026
Utilities
- indicates text translated automatically in your browsing language
Renovation of the gymnasium in the Technical School Complex in Suwałki
1.The subject of the order is the renovation of the gymnasium in the Technical School Complex in Suwałki in the scope of: 1) construction work consisting in the execution of: −preparatory and demolition works consisting, inter alia, of: zabezpieczeniu posadzki sali sportowej przed uszkodzeniem podczas prowadzonych prac, demontażu sufitu podwieszanego wraz z konstrukcją drewnianą i ułożonymi na niej kocami azbestowymi, demontażu opraw oświetleniowych, usunięciu gruzu z budynku wraz z odwiezieniem na odległość do 5 km i utylizacji, −na ścianie szczytowej - zachodniej usunięcia obudowy z płyt wiórowych oraz okna, zamurowania otworów bloczkami gr 24cm wraz z ich obustronnym otynkowaniem, wykonaniu gładzi gipsowych i pomalowaniu, −wymiany stolarki drzwiowej drewnianej na aluminiową dwuskrzydłową i jednoskrzydłową w obrębie sali gimnastycznej, zgodnie z kolorystyką uzgodnioną z użytkownikiem, drzwi z blendami wyposażonych w pochwyty, zamek, samozamykacz, −wyczyszczenia, zabezpieczenia antykorozyjnego i przeciw - pożarowego do R 30 konstrukcji stalowej – wiązarów kratowych, stężeń, −przetarcia, szpachlowania, malowania ścian i sufitu wraz z wykonaniem lamperii lakierem bezbarwnym do wysokości 2,0m, −lokalnych napraw posadzki sportowej, wymiany listew przypodłogowych, wycyklinowania, polakierowania posadzki z parkietu oraz naniesienia linii boisk, −remontu istniejącej balustrady stalowej na antresoli poprzez jej wyczyszczenie, podniesienie przez dodanie pochwytu z rury stalowej średnicy 50 mm, zabezpieczenie antykorozyjnie i pomalowanie nawierzchniowo, doprowadzenie do stanu spełniającego warunki techniczne, −wymiany posadzki antresoli oraz obłożenie parapetów glazurą, szpachlowania i malowania ścian lamperią z lakierem bezbarwnym do wysokości 2,0m −szpachlowania i malowania ścian i sufitu holu głównego wraz z wymianą drzwi stalowych zewnętrznych na nowe aluminiowe o profilu ciepłym, wyposażone w pochwyt, zamek antywłamaniowy, samozamykacz oraz jednoskrzydłowych drewnianych na drzwi aluminiowe jednoskrzydłowe o profilu zimnym, renowacja istniejącej lamperii z tynku mozaikowego w niezbędnym zakresie, kolorystyka stolarki do uzgodnienia z użytkownikiem, −szpachlowania i malowania ścian klatki schodowej prowadzącej z holu głównego na antresolę z wyburzeniem filarka drzwiowego i usunięciem drzwi drewnianych, wymiany posadzki biegów schodowych, remontu balustrady stalowej poprzez jej wyczyszczenie, podniesienia, zabezpieczenia antykorozyjnego i pomalowaniu nawierzchniowo, do stanu spełniającego warunki techniczne, szpachlowaniu i malowaniu ścian i sufitu w przyległym do schodów magazynku wraz z wymianą drzwi wejściowych drewnianych na aluminiowe, −dostawy i montażu żaluzji wewnętrznych na okna elewacji południowej, sterowanych elektrycznie, w kolorze uzgodnionym z użytkownikiem, −wymiany drzwi drewnianych na aluminiową żaluzję zabezpieczającą wraz z zamkiem, zamykaną na klucz, sterowaną i podnoszoną elektryczni, na holu głównym, w kolorze uzgodnionym z użytkownikiem, −zabezpieczenia ścian szczytowych i słupów pod antresolą materacami naściennymi o wysokości minimum 2,0 m, spełniającymi warunki bhp. installation of a protective net on the southern wall. 2) sanitary works - the scope of work includes the renovation of the c.o. installation installed on the northern wall of the hall in the ground floor and mezzanine level and in the staircase leading to the mezzanine. The scope of renovation of central heating installations includes dismantling of cast iron articulated radiators together with control and shut-off valves and dismantling of central heating installations, i.e.: verticals and deckchairs with shut-off valves, vent valves and handles. On the contractor's side is the disposal of dismantled elements of the central heating system. After dismantling the existing installation, it is necessary to make a new one from the level of the ground floor from galvanized carbon steel pipes equipped with shut-off valves, without thermal insulation. Mount double-plate steel radiators with power supply from below equipped with control valves with thermostatic heads, shut-off valves and vent valves. Overhaul of the control of the mechanical ventilation system of the hall - the scope of the overhaul includes the replacement of the controller of the existing mechanical ventilation unit of the sports hall located on the roof of the building along with the change of its location installation at the ground floor level along with the replacement of the cable installation connecting the controller with the control panel. 3) electrical works, in the scope of: −demolition and dismantling works of the electrical switchgear, lighting fixtures and electrical equipment in the renovated part of the building, −supply and assembly of the electrical switchgear of the gym. Main switchgear equipped with fuse switch 3P 40A gG. WLZ replacement for TS switchgear. Switchgear TS flush-mounted, 4x24mod with flat door and lock, −supply and installation of flush-mounted plastic fixtures, −supply and installation of basic lighting, fixtures mounted directly to the supporting structure of the hall roof, fixture made of lacquered steel sheet, with steel wire safety net. Detailed description of the luminaires in the attached documentation. the installation of emergency escape lighting on escape routes and at escape exits outside the building. Evacuation lighting should be carried out in accordance with the Polish Standard PN-EN 1838 ‘Application of lighting. Emergency lighting’ or equivalent. −supply and installation of power supply and sound system of the room in accordance with the attached project, −exchange of the existing scoreboard for a new, wirelessly controlled one, as described in the project. 2.The detailed scope of works shall include: the attached technical design of the electrical and construction industry, work schedules. 3.All works must be carried out in accordance with the technical documentation and applicable technical conditions and regulations.
https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-ffea7035-e390-4a1a-9648-ef27ac940cfd
https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-ffea7035-e390-4a1a-9648-ef27ac940cfd
Type: price
Description: C = (C minimalna/C badana) × 60 punktów, przy czym 1% odpowiada 1 pkt
Weight (percentage, exact):
Criterion:
Type: quality
Description: Ocenie podlega okres gwarancji i rękojmi w skali 0, 20, 40 - punktów, przy czym 1% odpowiada 1 pkt. Przy obliczaniu liczby punktów w kryterium gwarancja i rękojmia (G) Zamawiający zastosuje następujące wyliczenie: - za okres udzielenia gwarancji i rękojmi wynoszący co najmniej 5 lat – 0 punktów, - za okres udzielenia gwarancji i rękojmi wynoszący co najmniej 6 pełnych lat – 20 punktów, - za okres udzielenia gwarancji i rękojmi wynoszący co najmniej 7 pełnych lat i więcej – 40 punktów Punkty będą przyznawane za pełne lata np. za gwarancję i rękojmię zaoferowaną przez Wykonawcę w wysokości 6 lat i 7 miesięcy – 20 punktów. Minimalny okres gwarancji i rękojmi wynosi 5 lat. Jeżeli Wykonawca w Formularzu ofertowym nie wskaże żadnego okresu gwarancji i rękojmi Zamawiający przyjmie, że oferuje on minimalny okres gwarancji i rękojmi wynoszący 5 lat i przyzna 0 pkt. Jeżeli Wykonawca w Formularzu ofertowym zadeklaruje okres gwarancji i rękojmi mniejszy niż 5 lat Zamawiający odrzuci jego ofertę jako niezgodną z warunkami zamówienia.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.