Development of the Project for the rainwater canal with the replacement of hydraulic equipment, mechanical pumping station, automation system with a control cabinet and author's supervision during the implementation of works for investment task No. 0-05-22-152-1 Text automatically translated in your browsing language Automatically translated
The subject of the contract is the development of the Project in accordance with the applicable Construction Law, the Regulation of the Minister of Development and Technology of 20 December 2021 on the detailed scope and form of design documentation, technical specifications for the execution and acceptance of construction works and the functional and utility program (design documentation including land development, architectural and construction and technical design) for the construction of: - the rainwater drainage network in PoznaĆ as part of the investment project â0-05-22-152-1 Construction of a rainwater canal near the Avenida reservoirâ, together with obtaining a final decision on the construction permit/notification of construction works, together with obtaining a certificate confirming that there are no grounds for objection by the architectural and construction administration authority accepting the notification of construction or other construction works appropriate for the task in question (AQUANET S.A. allows a construction permit decision to be obtained in electronic form. Whether the building permit will be obtained in paper or electronic form remains to be decided by the Contractor) and performing copyright supervision during the execution of works carried out on the basis of the documentation being the subject of the contract from the date of conclusion of the contract with the Contractor of construction works to the signing of the final acceptance protocol for these works. Detailed requirements regarding the Subject of the Order and all information regarding design solutions are included in the attached technical conditions issued by "AQUANET" S.A. constituting the basis for the design. As part of copyright supervision, provision should be made for: for investment project 0-05-22-152-1 Construction of a rain canal near the Avenida reservoir âą Supervision cards with stay on the construction site â 10 Supervision cards âą Supervision cards without stay on the construction site â 10 Supervision cards in total of all supervision cards 20. In the event of the need to increase the number of stays on the construction site or increase the number of supervision cards without a stay on the construction site, unit prices from the Author's Supervision Agreement for the above-mentioned tasks will be accepted for settlements, whereby these prices will be valid for no more than 50% of the number of Supervision Cards with a stay on the construction site and no more than 50% of the number of Supervision Cards without a stay on the construction site presented above. Detailed Description of the Subject of the Contract is attached as Annex 8 to the SWZ. Text automatically translated in your browsing language Automatically translated
https://aquanet.ezamawiajacy.pl
https://aquanet.ezamawiajacy.pl
Type: price
Description: cena caĆkowita brutto
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.