-
Published17/02/2025
-
Deadline18/03/2025
-
Opening of tenders18/03/2025
-
Today24/03/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Opinion on the decoupling of the discharge of rainwater into the BWB network Text automatically translated in your browsing language Automatically translated
On behalf of the Lichtenberg School and Sports Office, the Lichtenberg Road and Green Area Office (SGA) plans to decouple areas of selected 24 properties (school locations) that discharge rainwater into the sewerage system of the Berliner Wasserbetriebe (BWB) and instead to seep the rainwater on site. In this way, the SGA wants to make a contribution to the so-called ‘sponge city’ by keeping the rainwater generated on site instead of in the sewers of the Berlin water companies and seeping there. To this end, a technical report on the 24 properties of the school and sports office is to be commissioned with proposals for concrete measures to be implemented. The properties should first be examined by an appraiser (e.g. engineering office) for their suitability for leaching or use of rainwater for irrigation by means of an inventory (e.g. pre-analysis of environmental atlas of contaminated sites, soil surveys if necessary to determine the permeability coefficient). On the basis of this study, concrete proposals for (structural) decoupling measures, including a cost estimate per property / per measure, are to be submitted and information on any necessary permits under water law for seepage is to be given. Not all proposed measures necessarily have to be economical over the planned useful life (full-armortising), although the most economical variant of the decoupling option must be planned. Therefore, a profitability study within the meaning of § 7 LHO must be carried out for each proposed measure, in this case in the form of a simple amortisation invoice. The aim is to document which measures are amortised within the lifetime of 25 years by the savings of the rainwater fee currently payable (according to current fees of Berliner Wasserbetriebe). In a second step, funds are to be applied for for the measures found to be economically viable for their structural implementation. The aim of the measure is to cut off the discharge of rainwater into the BWB sewerage system as far as possible and instead to seep it completely on site or in adjacent public green spaces or, in appropriate cases, to catch it for irrigation purposes. As a result, groundwater can be enriched and thus contribute to strengthening the resilience of Berlin's urban greenery. Specifically, the following planning objectives should be pursued: • Determination of the planning boundary conditions • Technical solutions for decoupling including cost approach for construction measures taking into account ground surveys • Soil modelling taking into account protected individual trees or vegetation worthy of protection and taking into account the use of the open space Text automatically translated in your browsing language Automatically translated
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
90712000 - Environmental planning
90712100 - Urban environmental development planning
90713100 - Consulting services for water-supply and waste-water other than for construction
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Zuschlagskriterium ist der geprüfte Bruttoangebotspreis über alle Leistungen, ohne Einbezug von Skonti oder anderen Preisnachlässen mit Bedingung. Etwaige gewährte Nachlässe sind in den Endpreis zu kalkulieren. Die Auftrag gebende Stelle behält sich vor, sich die (der Angebotskalkulation zugrundeliegende) Stundenaufstellung je Leistungsposition, auf gesondertes Verlangen, vorlegen zu lassen. Achtung: Für die Realisierung der Gesamtmaßnahme stehen maximal 250.000 € brutto aus dem BENE II – Programm zur Verfügung. Diese Summe muss alle angebotenen Leistungen beinhalten. Dieser Festpreis darf nicht überschritten werden, da es sich um öffentliche Fördermittel handelt. Angebote welche eine Gesamtsumme über 250.000 € brutto aufweisen, können im Prüfung- und Wertungsprozess keine Berücksichtigung finden und müssen ausgeschlossen werden. Mithin der Angebotssumme sind alle auftragsspezifischen Kosten abgegolten.
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.