‘Construction of provincial road No 627 between Kosów Lacki and Sokołów Podlaski’ Stage 1 from km 73+607 to km 85+200 – co-financed by the European Funds for Mazovia 2021-2027 programme, Stage 2 from km 85+200 to km 90+424 – co-financed by the European Union under the Interreg NEXT Poland-Ukraine 2021-2027 programme – Procedure No 042/25 - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

‘Construction of provincial road No 627 between Kosów Lacki and Sokołów Podlaski’ Stage 1 from km 73+607 to km 85+200 – co-financed by the European Funds for Mazovia 2021-2027 programme, Stage 2 from km 85+200 to km 90+424 – co-financed by the European Union under the Interreg NEXT Poland-Ukraine 2021-2027 programme – Procedure No 042/25 Text automatically translated in your browsing language Automatically translated

  • Published
    28/03/2025
  • Today
    22/04/2025
  • Deadline
    06/05/2025
  • Opening of tenders
    06/05/2025
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
Mazowiecki Zarząd Dróg Wojewódzkich w Warszawie
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL911 Miasto Warszawa
Business sector (Main CPV)
45233120 Road construction works
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
042/25
Description

1.Detailed description of the subject of the contract can be found in the Tender Document (Part IV SWZ), in the Bill of Quantities in the scope of stage 1 and 2 - available only for reference (Part V SWZ) and in the quotation cost estimate (in the scope of disposal of destruction containing exceeding the permissible limits for the content of polycyclic aromatic hydrocarbons) Part VI SWZ. The contractor must calculate the value of the works on the basis of the attached design documentation, on the basis of the amount of asphalt destruction to be disposed of indicated in the GTC, detailed technical specifications, general terms and conditions of the contract for the execution of construction works. 2.The Contractor is obliged to ensure, at his own expense, safe road and pedestrian traffic conditions in the area of the works covered by the contract, on the basis of a traffic organization project, "for the time of construction" drawn up by and at the expense of the Contractor. The Contractor shall be obliged to update the design of the permanent traffic organisation. The project has been adapted to the needs of all users, including ensuring accessibility for people with disabilities. As a public facility, it does not have accessibility restrictions for all road users, which is required by the regulations in force at the time of drawing up the project documentation regarding the requirements, inter alia, for the technical conditions to be met by roads: Regulation of the Minister of Transport and Maritime Economy on technical conditions to be met by public roads and their location (i.e. OJ 2016. Item 124 as amended) In order to provide facilities for the disabled and the elderly, the following documents have been prepared: at pedestrian crossings, lowering the curbs separating the road from the pavement, on pavements in front of pedestrian crossings and bus bay platforms, the use of warning paving panels and road lighting. The Contractor is obliged to transfer the copyright to the photographic and film documentation referred to in the general terms and conditions of the contract for the execution of construction works. 5.In the case of indicating in the description of the subject of the contract trademarks, patents or origin, source or a specific process that characterizes the product or services provided by a specific contractor, the Contracting Authority allows equivalent solutions. If reference is made in the description of the subject of the contract to standards, European technical assessments, approvals, technical specifications and technical reference systems, the Contracting Authority shall allow solutions equivalent to those described. 7. The contracting authority provides for the award of contracts referred to in Art. 1 point 7 of the Public Procurement Act up to a total value of PLN 200 215 526.81 net. A similar contract shall provide for: - preparatory works, - demolition works, - earthworks, - reinforcement of the ground, - drainage of the road body, - foundations, - surfaces, - finishing works, - traffic safety devices, - street elements, - works in the telecommunications industry, - works in the power industry. - works in the field of rainwater and sanitary sewerage, - works in the field of tank construction, - works in the field of water supply and pipelines, - works in the field of greenery management, - works in the field of traffic organization and BRD - works in the field of vehicle inspection sites The above-mentioned works concern the section on which construction works will be carried out and / or adjacent sections. 8. The Contractor is obliged to have a third party liability insurance policy for damage caused during the performance of the contract in the subject of the contract and to third parties for the entire duration of the contract and for a guarantee amount not lower than PLN 50 000 000.00. 1) The Contractor is obliged to provide a copy of the above-mentioned policy within 7 days from the date of conclusion of the contract. Provided that the continuity of insurance is maintained, the Ordering Party allows the possibility of presenting several policies confirming the possession of third party liability insurance during the term of the contract. 2) The Contractor is obliged to provide the Ordering Party with a copy of the next policy within 7 days from the expiry date of the previous policy. If the Contractor fails to comply with the above, the Contracting Authority shall charge the Contractor contractual penalties in the amount specified in the contract. 3) If the policy is not submitted within 30 days from the date of conclusion of the contract, the Ordering Party will have the right to withdraw from the contract. 9. Deadline for the execution of the contract: 24 months from the date of signing the contract, including: - 21 months from the date of signing the contract – deadline for completion of the works; - up to 24 months from the date of signing the contract - the date of implementation of the subject of the contract. Intermediate dates: The Contractor shall comply with the following intermediate deadlines (milestones) for the execution of the works and the sequence of their execution: I Milestone – execution of works (confirmed by a partial acceptance protocol) with a value of not less than 25% of the gross remuneration for the execution of the entire subject of the contract no later than 9 months from the date of signing the contract. Milestone II - execution of works (confirmed by a partial acceptance protocol) with a value of not less than 60% of the gross remuneration for the performance of the entire subject of the contract no later than 18 months from the date of conclusion of the contract. Milestone III - performance of 100% of works (confirmed by the Ordering Party with a protocol of final acceptance of works without significant defects) within a period not longer than the deadline for final acceptance of works. The contracting authority, in accordance with the terms of the contract, allows the possibility of changing the deadline for the implementation of intermediate deadlines. The Contracting Authority will be entitled to charge contractual penalties in accordance with the contract for non-fulfilment of the intermediate milestone. 10. The contractor whose tender has been selected as the most advantageous shall lodge a performance bond amounting to 5% of the total price quoted in the tender. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://www.platformazakupowa.pl/transakcja/1082413
Tenders may be submitted
Electronic submission: required
https://www.platformazakupowa.pl/transakcja/1082413
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
06/05/2025 09:00
Place of performance
Award method
doświadczenie Kierownika Budowy
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.