-
Published05/06/2025
-
Deadline07/07/2025
-
Today17/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
BIM general planning "Electrification and expansion of the Main Valley Railway"; Lots 1-4; Lph. 1-2 (opt. Lph. 3-4, 6) Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The project "Electrification and expansion of Aschaffenburg - Miltenberg" is to be implemented as part of the Bavarian Electric Mobility Strategy for Rail (BESS). The line is to be electrified, double-tracked in sections, extended by a crossing station Sulzbach am Main and the speed partially increased. The aim is to increase the capacity and flexibility of the route in such a way that the introduction of a conflict-free half-hourly clock is made possible. The electrification and expansion of the Aschaffenburg-Miltenberg railway line is intended to implement various measures to decarbonise, increase capacity and accelerate, thereby making local rail passenger transport (SPNV) more attractive. The 39-kilometre traffic connection consists of the VzG route 5220: Aschaffenburg Hbf- Bft Miltenberg West as well as from the first two kilometers of the VzG line 5224: Bft Miltenberg West – Wertheim together. With the electrification and expansion of the Main Valley Railway, switch-free SPNV connections from Miltenberg to Frankfurt (Main) and Darmstadt with electric traction are to be made possible. Due to the installation space required for the overhead contact line, adjustments to various bridge and tunnel structures as well as occasional lowering of the track are required along the entire route. According to the operational requirements resulting from the intended vehicles, all required platforms are brought to a useful length of 215 m (order length 220 m) and raised to 76 cm. This also results in adaptations and new constructions of the platform access routes to restore full accessibility. The project ‘Electrification and expansion Aschaffenburg – Miltenberg’ is not part of the TEN core/comprehensive network; the project ‘Electrification and expansion Aschaffenburg – Miltenberg’ is not part of the High Performance Network (HLN); The project is not anchored in the new and expansion strategy of DB InfraGO AG's network concept. The traffic objective of the overall project "Electrification and expansion Aschaffenburg – Mil-tenberg" includes ensuring the necessary capacities in the SPNV for the forecast horizon 2034 with economically optimal operating quality. Text automatically translated in your browsing language Automatically translated
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/b4ffe6c6-cf4f-42b1-829a-c348c48dd537
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/b4ffe6c6-cf4f-42b1-829a-c348c48dd537
71321100 - Construction economics services
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.